IEC 60870-5-104 Without Encryption Under NIS2: What Article 21(2)(h) Allows, Where IEC 62351 Fits, and How to Document the Exception

In short

  • IEC 62351 and NIS2: no EU text bans plain IEC 60870-5-104. Article 21(2)(h) asks for cryptography policies and, “where appropriate”, encryption.
  • The CIR’s cryptography chapter binds only the digital providers in its Article 1, not grid operators.
  • ENTSO-E’s draft gateway profile wants cryptography on the WAN and accepts segregation inside substations, for new gateways only.
  • Checked against: Directive (EU) 2022/2555, Regulation (EU) 2024/2690, Regulation (EU) 2024/1366.

A claim keeps turning up in OT security pitches: NIS2 makes plain IEC 60870-5-104 non-compliant, so every RTU link needs TLS before the next audit. The legal text does not say that. Article 21(2)(h) of the NIS2 Directive requires “policies and procedures regarding the use of cryptography and, where appropriate, encryption”, which turns encryption into a documented, risk-based decision rather than a protocol ban.

That does not make a clear-text telecontrol link safe to ignore. It means the questions a supervisor asks are different from the ones vendors answer: which text binds you, what your cryptography policy says about 104, why the IEC 62351 upgrade is not done yet, and what you run instead. This guide answers those four, using the Directive, the implementing regulation, the electricity network code and the IEC 62351 documents themselves.

Who This Applies To, and Which Text Binds You

Plain-language summary: the same unencrypted 104 link is judged under different texts depending on who runs it. A grid operator answers to its national NIS2 law, a managed service provider to the EU implementing regulation as well, and a designated electricity entity will later answer to the network code too.

Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

The Commission’s implementing regulation, CIR 2024/2690, is the most detailed EU text on cryptography, but its Article 1 limits it to DNS service providers, TLD name registries, cloud, data centre and content delivery network providers, managed service providers, managed security service providers, online marketplaces, search engines, social networks and trust service providers. Electricity, gas and heat operators are not on that list. For them, the Annex is a reference for what good looks like, not a binding text.

Who runs the 104 link Text that binds the cryptography decision What it means for a plain 104 link
Energy operator in scope of NIS2 (essential or important entity) National law transposing Article 21(2)(h) and 21(1) A cryptography policy is required; encryption of the link is decided “where appropriate” and must follow from your risk assessment
Managed service provider or MSSP that operates telecontrol networks for a utility CIR 2024/2690 Annex point 9, plus Article 2(2) of the CIR On our reading the operated links are part of the systems used to deliver the managed service, so the policy must set protection for data in transit by asset classification, and any skipped qualified item needs written reasoning
Electricity entity designated high-impact or critical-impact under the network code (NCCS) Regulation (EU) 2024/1366, Article 26 (risk management) and Articles 28 to 30 (controls, once approved) Minimum or advanced controls inside the defined perimeter; any gap needs a derogation granted by the competent authority
German grid or energy plant operator under §§ 5c to 5e of the Energy Industry Act (EnWG) The EnWG route; § 30 BSIG does not apply (§ 28(5) BSIG) Check the sector catalogue of your regulator; we did not verify its telecontrol wording for this article

The biggest takeaway from the table: an energy company is not bound by CIR Annex point 9 itself, but on our reading the managed service provider that runs its SCADA network is. If you outsource telecontrol operations, ask your provider for its cryptography policy entry for your links.

What Article 21(2)(h) Actually Requires for Telecontrol Links

Plain-language summary: you must have a cryptography policy and procedures. Whether a particular link is encrypted is a judgement the policy has to make and justify. Article 21(1) frames that judgement: measures must be “appropriate and proportionate”, take into account “the state-of-the-art and, where applicable, relevant European and international standards, as well as the cost of implementation”, and weigh exposure, size, likelihood and severity of incidents, “including their societal and economic impact”.

The CIR shows how the Commission expects such a policy to work, even where it does not bind you. Its Annex point 9.1 ties the cryptography policy to “the relevant entities’ asset classification and the results of the risk assessment”. Point 9.2(a) then requires the policy to set “the type, strength and quality of the cryptographic measures required to protect the relevant entities’ assets, including data at rest and data in transit”. That sentence carries no “where appropriate”. The qualifiers appear only in 9.2(b), for “a cryptographic agility approach”, and in 9.2(c), for the listed key management methods.

So even under the strictest EU text, the escape clause is not “encrypt only where appropriate”. The duty is to decide, by classification, what protection data in transit gets. A policy line that reads “telecontrol: no cryptographic protection” is a decision too, and it needs the classification and risk result behind it. Point 9.3 adds a review “at planned intervals, taking into account the state of the art in cryptography”.

Two details change how you write that policy:

  • Cryptography is not only encryption. For a breaker command, proof that it came from an authorised station and was not altered usually matters more than secrecy. The IEC’s own description of IEC TS 60870-5-7 gives the purpose as letting the receiver “verify that the APDU was transmitted by an authorized user and that the APDU was not modified in transit”. That is cryptographic protection of authenticity and integrity, which Article 21(2)(h) covers, without being encryption in the narrow sense.
  • National wording varies. Germany’s § 30(2) No. 8 BSIG requires “Konzepte und Prozesse für den Einsatz von kryptographischen Verfahren” and drops the “where appropriate, encryption” clause. As the table above shows, German grid operators covered by the EnWG route are generally outside § 30 anyway, which is why you should read your own national text rather than the Directive alone.

Our cryptography and encryption guide covers the general structure of an Article 21(2)(h) policy. The rest of this article deals with what is specific to 104.

What IEC 104 Lacks, and Which IEC 62351 Part Closes Each Gap

Plain-language summary: IEC 62351 is not one fix. Five parts address five different weaknesses; Parts 3 and 5 are 2023 editions, and the specification that applies them to 101 and 104, IEC TS 60870-5-7, followed in 2025.

According to the IEC Smart Energy committee’s overview, IEC 62351-3 covers the TCP/IP profile used by “IEC 60870-5 Part 104”, while IEC 62351-5 covers both serial and networked profiles used through IEC 60870-5-7, the security extension for 101 and 104. The table maps each gap to the part that closes it and to what has to exist before it can work.

Gap in plain 104 IEC 62351 part What it adds What must exist first
Traffic can be read or altered on the TCP/IP path IEC 62351-3:2023 (edition 2.0) A TLS 1.2 and TLS 1.3 profile giving confidentiality, integrity protection and message-level authentication; mandatory TLS 1.2 cipher suites; revocation handling via CRL and OCSP; defined security events TLS support in both the RTU or gateway and the SCADA front end, plus certificates on both sides
No proof that a command came from an authorised station or user IEC 62351-5:2023 with IEC TS 60870-5-7:2025 Application-layer protection of each APDU; the 2023 edition added authenticated encryption of application data and event monitoring and logging Protocol-stack support on both ends; the 101/104 message formats are defined in IEC TS 60870-5-7, edition 2.0 published 18 March 2025
No roles: any connected master can do anything IEC 62351-8 (applied to 101/104 by IEC TS 60870-5-7 edition 2) Role-based access control on a “subjects-roles-rights” model, with pre-defined roles A role model and central account management
No key or certificate lifecycle IEC 62351-9 How to generate, distribute, revoke and handle certificates and cryptographic keys A public key infrastructure the OT team can operate
No security logging IEC 62351-14 (and the events defined in 62351-3) Syslog-based security event logging A log collector that OT can reach

The takeaway: TLS under 62351-3 authenticates the connection and protects it on the network path, 62351-5 authenticates each telecontrol message, and both rely on certificates or keys, which 62351-9 defines how to manage. Conformance tests are being developed as technical specifications in the 62351-100 series, including Part 100-3 for Part 3 and Part 100-1 for Part 5.

A documented example of the 62351-3 route comes from Hitachi Energy, describing a European transmission system operator with more than 70,000 km of high-voltage line. Its specification combined IEC 60870-5-104 with TLS based on IEC 62351-3, with X.509 certificates and “mandatory mutual authentication of client and server”; before that, according to the vendor, control-centre communication ran “without any security level”. It is a vendor case study, so treat it as an illustration rather than evidence of typical cost or effort.

Why Retrofitting IEC 62351 Takes Years, Not a Patch Cycle

Plain-language summary: many installed RTUs cannot be upgraded in place, both ends of every link must change together, and the standards for securing 104 at application level have only just settled. A supervisor will accept a migration timeline more readily if your file shows these constraints than if it simply says “planned”.

More than 20 years is how long an OT system can remain in service, according to NIST, which is why many legacy systems contain hardware and software their vendors no longer support.

Source: NIST SP 800-82r3, Guide to Operational Technology (OT) Security

  1. The hardware often cannot carry it. NIST SP 800-82r3 notes that legacy OT systems “may also lack desired features, including encryption capabilities”, and that “there may not be computing resources available on OT components to retrofit these systems with current security capabilities”. For an RTU, that usually means replacement, not a firmware option.
  2. Both ends change at once. Mutual authentication means the SCADA front end and every RTU on the link need compatible TLS stacks and certificates. Upgrades therefore have to be coordinated link by link, and in our reading the pace is set by the oldest device on each link.
  3. The 104 security standards are recent. IEC 62351-3 edition 2 dates from June 2023, IEC 62351-5 from January 2023, and IEC TS 60870-5-7 edition 2 from March 2025. IEC 62351-5 itself states that its measures take effect only when “accepted and referenced by the specifications for the protocols themselves”. Devices bought before those dates may implement older editions or none.
  4. Certificates need an owner. IEC 62351-9 covers generating, distributing and revoking keys and certificates, and 62351-3 edition 2 adds revocation checks via CRL and OCSP. ENTSO-E’s draft gateway profile describes substations as unattended most of the time, so renewal and revocation have to work remotely and without breaking control.
  5. Encryption blinds your monitoring. NIST warns that an intrusion detection system “may be unable to determine whether encrypted network communication is malicious”. Monitoring that inspects 104 commands has to see them, and NIST suggests capturing traffic before or after encryption when encrypted links are expected. Encrypting first and re-engineering monitoring later swaps one gap for another.
  6. The procurement guidance only looks forward. ENTSO-E’s draft profile says its requirements “are not meant to be applied retroactively to already installed gateways”. The 62351 route enters through the replacement cycle, which is why the exception record below needs a migration trigger.

Our guide to legacy systems under NIS2 covers the general maintenance and patching side of old assets. Cryptography is the part where the protocol, not just the device, is the limit.

The Line ENTSO-E’s Draft Profile Draws: WAN Versus Inside the Substation

Plain-language summary: the electricity sector’s own draft procurement guidance asks gateways to support cryptographic protection where 104 traffic leaves the substation and accepts segregation, access control and physical protection inside it. It is non-binding, but it is the closest thing to an EU sector benchmark for the “where appropriate” judgement.

Under Article 35 of the network code, the TSOs, with the assistance of ENTSO-E and in cooperation with the EU DSO entity, have proposed a non-binding procurement recommendation for substation gateways and RTUs in high-voltage grids; its Article 1 excludes distribution automation gateways and RTUs in medium-voltage grids. The attached gateway profile notes that SCADA systems talk to gateways with “IEC 60870-5-104 and IEC 60870-5-101” and lists IEC 62351-3:2023, IEC 62351-8:2020 and IEC 62351-9:2023 among its selected standards. Two of its requirements matter here:

  • Communication authenticity (CR 3.1, enhancement 1): the gateway must be able to verify information received over the WAN “using cryptographic methods”. The recommended implementation is TLS following IEC 62351-3.
  • Confidentiality (CR 4.1): the gateway must support encryption of information in transit over the WAN, again via TLS following IEC 62351-3.

For both, the profile adds the same sentence: “Inside substations, information in transit or at rest may be protected through network segregation, access control and physical protection.” For authenticating the SCADA system it also accepts a VPN tunnel terminating at the component as an alternative to TLS with client certificates. And it states that its interoperability recommendations, which usually point to IEC 62351, “do not have to be fulfilled to be compliant with the profile”.

The network code’s interim rules point the same way. The final controls do not exist yet: Article 29(1) has them proposed only after the first draft Union-wide risk assessment report, and ENTSO-E’s NCCS page lists provisional guidance in their place. Until the minimum and advanced controls are developed and approved, Article 48(10) says entities “shall strive to progressively apply” ENTSO-E’s provisional guidance. That provisional list says entities “can additionally consider” IEC 62443, IEC 62351 and NIST SP 800-82, and its Annex 1 marks ISO/IEC 27001:2022 control 8.24 (use of cryptography) and 8.22 (segregation of networks) as both minimum and advanced controls. Our NCCS timeline explains when those controls become binding.

Our recommendation from this: rank your 104 links by where the traffic travels. Links over leased lines, carrier networks, radio or anything shared with corporate IT come first for cryptographic protection; links that never leave a locked, segregated substation network can rely on segregation, access control and physical protection for longer, if your risk assessment says so.

Compensating Controls for a Plain 104 Link, and What Each Leaves Open

Plain-language summary: compensating controls are accepted practice, but each closes only part of the gap. Your exception record should say which part.

NIST SP 800-82r3 says that “when security controls are not supported by the legacy OT system, compensating controls should be considered”, and it advises considering encryption where OT connections “must pass over non-OT network segments”. It also lists a “VPN tunnel, encrypted channel, point-to-point connection” among the secure connections to use “between remote stations and control centers”. The table pairs the common options with what they leave open.

Compensating control Risk it reduces What stays open Evidence to keep
VPN tunnel (IPsec or TLS) between the substation router and the control centre Eavesdropping and injection on the WAN leg Clear text inside the substation and the control-centre LAN; no authentication of the RTU or of individual messages beyond the tunnel endpoints. IEC 62351-3 treats such “bump-in-the-wire” devices as out of scope, so on our reading this does not implement 62351-3 Tunnel configuration, cipher settings checked against your cryptography policy, key and certificate register
Segmentation with firewall rules that allow 104 only between named SCADA front ends and RTUs Lateral movement from IT or other zones Spoofed commands from an allowed host Rule-base export, last review date, change tickets
Private APN or dedicated telecontrol network Exposure to the internet and shared carrier traffic Insider and carrier-side threats Carrier contract and network configuration
Passive, 104-aware network monitoring Late detection of unexpected commands Prevention; it only alerts Alert rules, tuning records, response tickets
Physical security and access control at the substation Local tapping or a rogue device on the bus Remote attacks Access logs and key or badge records

The pattern: a VPN covers the WAN, segmentation and monitoring cover the inside, and only cryptography that ends in the RTU itself authenticates the traffic: TLS under 62351-3 authenticates the connection, and 62351-5 each message. Write that residual risk down explicitly. Remote engineering access is a separate path with its own rules; see our guide to MFA in OT environments, and our network security guide for zone design.

How to Document the Exception So It Survives Review

Plain-language summary: Articles 20 and 21 of NIS2 contain no derogation procedure, so the exception lives in your own risk file and is approved by your management body. The network code will have a formal derogation, granted by the authority and capped at three years, once its controls apply.

Under NIS2. Article 20(1) requires management bodies to “approve the cybersecurity risk-management measures” taken to comply with Article 21, so the decision to leave a link unencrypted for now belongs in a document they sign off. For CIR entities, Article 2(2) of the CIR adds that where a qualified requirement is not applied, the entity “shall in a comprehensible manner document its reasoning to that effect”. That standard binds only the CIR list, but it is a sound model for everyone. Article 21(4) of the Directive adds that an entity that finds it does not comply must take corrective measures “without undue delay”, which is why a migration date matters.

Under the network code. Article 30(1) lets a high-impact or critical-impact entity ask its competent authority for a derogation from the minimum and advanced controls on one of two grounds: (a) “in exceptional circumstances”, where the entity can show that the costs of the controls “significantly exceed the benefits”, or (b) where it provides an entity-level risk treatment plan “using alternative controls” that reduces risk to a level acceptable under the Article 26(3)(b) criteria. The authority decides within three months, and a derogation is granted “for a maximum of three years, with the possibility of renewal”. The route opens only once the controls are approved and Article 29(6) applies to you.

3 years is the longest an NCCS derogation from the minimum or advanced cybersecurity controls can run before it must be renewed.

Source: Commission Delegated Regulation (EU) 2024/1366, Article 30(2)

A record built for ground (b) also serves NIS2 today, so write one record that works for both. We suggest these ten fields:

  1. Link identifiers: RTU or gateway, SCADA front end, network legs crossed (inside substation, WAN, carrier).
  2. Asset classification of the link and of the data it carries (commands, measurements, both).
  3. Threats considered, including those named in your sector or national risk assessment.
  4. Why IEC 62351 is not applied yet: device model, firmware version, vendor statement on TLS or 62351-5 support.
  5. Compensating controls in place, each with the evidence listed in the table above.
  6. Residual risk, stated plainly, including the absence of message authentication between the SCADA front end and the RTU.
  7. Who accepted the residual risk and when, with the management body approval reference.
  8. Migration trigger: the replacement project, budget year or procurement specification that brings 62351-3 or 62351-5.
  9. Review date, no later than three years out, matching the NCCS derogation cap.
  10. Monitoring indicators that would force an earlier review (new vulnerability, change of carrier, incident).

Under the network code, Article 26(4)(a)(iii) also requires designated entities to consider “vulnerabilities, including vulnerabilities in legacy systems” in their risk assessment, so fields 3 to 6 do double duty.

Who Owns Which Part

Plain-language summary: engineers own the facts, compliance owns the record, the board owns the risk, and procurement owns the end date.

Role Owns First action
CISO or OT security lead Link inventory, classification, compensating controls, 62351 feasibility per device List every 104 and 101 link with the network legs it crosses and the device’s TLS or 62351-5 support
Compliance officer Cryptography policy entry for telecontrol, exception records, review dates Check whether your national law copies “where appropriate, encryption” or, like § 30 BSIG, drops it
Board or management body Approval of the measures and the accepted residual risk (Article 20(1)) Approve the exception records with a migration date, not an open-ended acceptance
Procurement Specifications for replacement gateways and RTUs Reference IEC 62351-3 and the ENTSO-E draft gateway profile in new tenders, if you are a high-voltage operator

If your organisation is still working out whether it is in scope at all, start with our energy sector compliance guide. For how IEC 62443, the standard behind the ENTSO-E profile, maps to Article 21, see IEC 62443 and NIS2.

Frequently Asked Questions

Is unencrypted IEC 60870-5-104 illegal under NIS2?

No EU provision bans it by name. Article 21(2)(h) requires cryptography policies and procedures and encryption “where appropriate”, so a clear-text link is acceptable only if your risk assessment and cryptography policy justify it and your management body has approved that decision.

Does CIR 2024/2690 Annex point 9 apply to an electricity operator?

Not directly. Article 1 of the CIR limits it to digital providers such as cloud, data centre, managed service and managed security service providers. On our reading it does apply to a managed service provider that operates a utility’s telecontrol network, and it is a useful model for everyone else.

Is IEC 62351 compliance the same as NIS2 compliance?

No. Article 21(1) asks you to take relevant European and international standards into account “where applicable”. IEC 62351 is one way to protect telecontrol traffic, but NIS2 compliance also depends on your policy, risk assessment, approvals and the other Article 21(2) measures.

Is a VPN enough to cover a legacy 104 link?

A VPN protects the WAN leg. NIST lists VPN tunnels among the secure connections to use between remote stations and control centres, and the ENTSO-E draft profile accepts a VPN for authenticating the SCADA system. It does not protect traffic inside the substation or authenticate individual commands, and IEC 62351-3 treats such external devices as out of its scope, so record it as a compensating control.

Does the network code on cybersecurity require IEC 62351?

Not as such. The final minimum and advanced controls have not been published yet, and ENTSO-E’s provisional list only says entities “can additionally consider” IEC 62351. Its draft gateway procurement profile recommends 62351-3, -8 and -9 for new high-voltage gateways but keeps them optional for compliance with the profile.

Start with the inventory: every 104 and 101 link, the legs it crosses and what each device can support. That list decides which links get cryptography first and which need an exception record this quarter.

This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.

Sources

  1. European Union. Directive (EU) 2022/2555 (NIS2 Directive), Articles 20 and 21. EUR-Lex
  2. NIS2 Directive, Article 21: Cybersecurity risk-management measures (text). nis-2-directive.com
  3. European Commission. Implementing Regulation (EU) 2024/2690, Articles 1 and 2 and Annex point 9. EUR-Lex
  4. European Commission. Delegated Regulation (EU) 2024/1366, network code on cybersecurity aspects of cross-border electricity flows. Official Journal (EUR-Lex copy, Internet Archive)
  5. ENTSO-E. Network Code on Cybersecurity: status and deliverables. ENTSO-E
  6. ENTSO-E and EU DSO entity. Annex I: Substation Gateway Cybersecurity Profile (proposal under NCCS Article 35). ENTSO-E
  7. ENTSO-E and EU DSO entity. Procurement Recommendation for Substation Gateways (proposal). ENTSO-E
  8. ENTSO-E and EU DSO entity. Provisional List of European and International Standards and Controls (NCCS Article 48). ENTSO-E
  9. ENTSO-E and EU DSO entity. Annex 1: Minimum and Advanced Cyber Security Controls (provisional). ENTSO-E
  10. IEC. IEC 62351-3:2023, Profiles including TCP/IP. IEC Webstore
  11. IEC. IEC 62351-5:2023, Security for IEC 60870-5 and derivatives. IEC Webstore
  12. IEC. IEC TS 60870-5-7:2025, Security extensions to IEC 60870-5-101 and IEC 60870-5-104 protocols (applying IEC 62351). IEC Webstore
  13. IEC Systems Committee Smart Energy. IEC 62351: Cyber Security Series for the Smart Grid. IEC
  14. NIST. SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security. National Institute of Standards and Technology
  15. Hitachi Energy. RTU cybersecurity solutions deliver peace of mind (customer story). Hitachi Energy
  16. Germany. BSI-Gesetz (BSIG), § 30 Risikomanagementmaßnahmen besonders wichtiger Einrichtungen und wichtiger Einrichtungen. gesetze-im-internet.de
  17. Germany. BSI-Gesetz (BSIG), § 28 Besonders wichtige Einrichtungen und wichtige Einrichtungen. gesetze-im-internet.de
  18. NIS2 Templates. NIS2 Policy Pack – Energy (our product, referenced in the recommendation boxes). nis-2-templates.com
  19. NIS2 Templates. NIS2 Complete Toolkit (our product, referenced in the recommendation boxes). nis-2-templates.com
Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

Don't miss: