Concept illustration of a circuit board with a light timeline running across it, representing the CRA support period

CRA Support Period: Five Years Is the Floor, Not the Default — How to Set, Justify and Publish the End Date

In short

  • The CRA support period is set by the manufacturer under Article 13(8): at least five years, or the expected use time if the product will be in use for less.
  • Its end date, at least month and year, must be clear at the time of purchase (Article 13(19)).
  • Checked against: Regulation (EU) 2024/2847, Commission guidance C/2026/6013 and the Commission services’ CRA FAQ.

Most product teams read Article 13(8) of the Cyber Resilience Act as “support it for five years”. The Commission reads it differently. Its guidance says five years “is therefore not to be considered as the default for all products with digital elements”: the figure is a floor, and the real answer starts from the time your product is expected to stay in use. A router, an operating system or an industrial control system will often need more. A pandemic contact-tracing app may need less.

This guide covers how the period is set, when its clock starts, how to justify the number, where the end date has to be shown, and which duties run during the period and after it. It ends with a determination record you can copy into your technical documentation, and a checklist for NIS2 entities that buy these products and now have to ask their suppliers for the date.

Does the support period apply to your product?

In plain terms: you need a declared support period for every product with digital elements you place on the EU market from 11 December 2027. Products already on the market before that date need one only if they are substantially modified from that date. The vulnerability reporting duty in Article 14 is separate and already applies to both.

Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

Situation Support period needed? Article 14 reporting Basis
Product placed on the market on or after 11 December 2027 Yes, determined under Article 13(8) Yes Art 13(8), Art 71(2)
Product placed before 11 December 2027, not substantially modified No CRA support period, and no Annex I Part II handling duties Yes, since 11 September 2026 Art 69(2) and (3); guidance para 210
Older product substantially modified from 11 December 2027 Yes, for the modified product Yes Art 69(2); guidance paras 132-135
New units of an older model placed from 11 December 2027 Yes, for those units Yes Guidance paras 11 and 33; FAQ 4.5.3
Each substantially modified version of a software product Yes, its own declared period Yes Guidance para 128

The last two rows catch most teams out. Placing on the market applies to each individual product, not to a type. The Commission’s guidance takes that from the Blue Guide. A hardware model designed in 2024 therefore needs a support period for the units you ship from 11 December 2027. That does not mean redesigning those units. The guidance asks for a cybersecurity risk assessment, and existing security measures can be enough if that assessment shows they address the risks. For the duties that run during the period, see our CRA vulnerability handling procedure for Annex I Part II.

What Article 13(8) actually requires

In plain terms: the law gives you three mandatory factors, four optional ones, a proportionality test and a five-year floor. The shorter period is an exception with a narrow test.

The Cyber Resilience Act defines the support period in Article 3(20) as the period during which a manufacturer must ensure that vulnerabilities are handled effectively and in line with Annex I Part II. Article 13(8) then sets out how to determine it, in this order:

Layer What the text says Wording
Anchor The period reflects “the length of time during which the product is expected to be in use” “shall determine”
Mandatory factors Reasonable user expectations; the nature of the product, including its intended purpose; relevant Union law determining the lifetime of products with digital elements “taking into account, in particular”
Optional factors Support periods of products with similar functionality from other manufacturers; availability of the operating environment; support periods of third-party components that provide core functions; guidance from ADCO and the Commission “may also take into account”
Proportionality All factors are “considered in a manner that ensures proportionality” “shall be considered”
Floor At least five years; where the product is expected to be in use for less than five years, the period corresponds to the expected use time “shall be at least five years”

Two sources from the Commission read the anchor slightly differently, and the difference matters when your expected use time is long. The Commission guidance C/2026/6013 says the support period “reflects the period of time during which the product with digital elements is expected to be in use” (para 125). The Commission services’ CRA FAQ adds that manufacturers “are not expected to simply set support periods that correspond to the expected use time” unless that time is under five years (FAQ 4.5.1). One reading is that the period should equal the expected use time. The other is that proportionality can bring it below the expected use time, but never below five years. The FAQ itself states that it does not represent the Commission’s official position. Until a market surveillance authority or a court settles this, the safe course is to record why the period you chose differs from the expected use time, if it does.

The exception for a period under five years is narrow. Recital 60 and FAQ 4.5.2 allow it only where the product’s lifetime really is shorter. Their examples are a contact-tracing app for the duration of a pandemic, and software that is only available on a subscription and stops working when the subscription ends, such as enterprise antivirus that depends on current definitions. A shorter commercial plan does not meet that test. A fast release cycle does not either: each substantially modified software version needs at least five years unless its own expected use time is demonstrably shorter (guidance para 128).

When the clock starts: per batch, per version

In plain terms: the CRA has no single end date for a product model. Hardware is counted from each placing on the market. Software is counted per version.

The FAQ gives a worked example for hardware (FAQ 4.5.3). A manufacturer places 10,000 identical units on the market in January 2028 with a five-year support period, so that period runs until January 2033. Distributors may keep selling those units after January 2033. When the same manufacturer places another 5,000 identical units on 1 January 2030, it “is required to set a support period for those units”. The FAQ does not say how long that second period must be. Because the five-year floor applies to every period you set, our reading is that the second batch cannot end before January 2035 unless its expected use time is shorter. In practice, one model then carries several end dates, and your labelling and records must keep them apart.

January 2033 is the end date in the Commission services’ example for 10,000 units placed on the market in January 2028 with a five-year support period. Units placed later need their own period.

Source: Commission services, FAQs on the Cyber Resilience Act, FAQ 4.5.3

Software works the other way round. The guidance says that copies of one software version count as placed on the market at the same time, “regardless of when possession or use of each individual copy is transferred” (para 14). Each substantially modified version needs its own declared support period, at least five years unless the version’s expected use time is “demonstrably shorter” (para 128). One effect follows from those two rules, and it is our inference rather than a sentence in the guidance: a customer who buys an older version late in its life gets only the remainder of that version’s period. That is why Article 13(19) asks for an end date at the time of purchase, not a duration.

Article 13(10) adds some flexibility for software. If users of earlier versions can move to the latest version free of charge, without “additional costs” to adjust their hardware and software environment, you may limit point (2) of Part II (addressing and remediating vulnerabilities) to the latest version. The guidance says “additional costs” means things like buying new hardware, replacing infrastructure or fundamentally changing the operating environment. Personnel time, routine testing, configuration adjustments and upgrades of underlying software dependencies that are needed to address end-of-life components or known vulnerabilities do not count (para 130). You remain subject to the other Part II duties, such as coordinated vulnerability disclosure, and to Article 14 reporting (para 131). Where you stop fixing earlier versions, the guidance expects users who have not upgraded to be told, if that is technically feasible (footnote 18).

How to justify the number

In plain terms: write down the evidence for the expected use time first, then check the optional factors, then choose. Market surveillance authorities must monitor how manufacturers applied these criteria (Article 52(16)), so the reasoning is what they will look at.

Step What to collect Effort
1. Expected use time Field data on how long installed units stay in service, warranty and service-contract terms, typical customer replacement cycles, the product’s intended purpose Medium
2. Union law on lifetime Any EU rule that fixes how long the product or its software must be supported, or state “none identified” Low
3. Optional factors Peer products’ published periods; end of support of the operating system or runtime; support end dates of core third-party components Medium
4. Proportionality and decision Length chosen, end date (month and year), and why it differs from the expected use time, if it does Low
5. Approval and review triggers Who signed off, and what forces a review (substantial modification, component end-of-life notice, ADCO guidance) Low

Step 2 is where many teams have nothing to write. Commission Regulation (EU) 2023/1670 is one example of a Union law that fixes a minimum support time. Answering a question about Android devices, the Commission’s energy-efficient products FAQ explains that operating system updates, where provided, must be made available at no cost for all units of a product model with the same operating system, “from the date of end of placement on the market to at least 5 years after that date”. The CRA does not name that regulation. Our reading is that it is the kind of law Article 13(8) refers to, and its start point (the end of placement of the model) is later than the CRA’s.

Step 3 has a trap. Choosing a component with a short support life does not shorten your obligation. The FAQ says that if a component goes out of support while your product is still in its period, and a vulnerability in it cannot be mitigated, you must fix it “by switching out the integrated component or developing a patch autonomously” (FAQ 4.3.7). Check the component end dates before you commit to an end date, not after.

A worked example, with our own figures: an industrial gateway. Customers typically keep it in service for twelve years, the embedded Linux distribution has vendor support for ten years from release, and the cellular module has eight years left. Recital 60 says products for industrial settings, such as industrial control systems, “are often in use for significantly longer periods of time”. A five-year period would be hard to defend here. A twelve-year period means planning a module replacement or in-house patching from year nine, and patching the Linux base yourself from year eleven, and the record should say so.

What runs during the period, and what outlasts it

In plain terms: the support period switches the handling duties on and off. Several other clocks are longer, and reporting never stops.

Duty How long Basis
Handle vulnerabilities per Annex I Part II (SBOM, remediation without delay, tests, disclosure, CVD policy, secure update distribution, security updates with advisories) From placing on the market and for the support period Art 13(8); Annex I Part II
Keep the cybersecurity risk assessment updated As appropriate, during the support period Art 13(3)
Keep the technical documentation updated Continuously, where appropriate, at least during the support period Art 31(2)
Corrective measures for non-conformity From placing on the market and for the support period Art 13(21)
Keep each security update available At least 10 years after issue, or the remainder of the support period, whichever is longer Art 13(9)
Keep technical documentation and EU declaration of conformity 10 years after placing on the market, or the support period, whichever is longer Art 13(13)
Keep Annex II user information available 10 years after placing on the market, or the support period, whichever is longer Art 13(18)
Report actively exploited vulnerabilities and severe incidents Continues after the support period ends Art 14; guidance para 210

10 years is the minimum time each security update released during the support period must stay available after it is issued, or longer if the support period runs longer.

Source: Regulation (EU) 2024/2847, Article 13(9)

Two points stop this table being read too strictly. First, the support period does not mean patching every finding. The FAQ says the CRA “does not require manufacturers to provide a patch for all vulnerabilities that are discovered during a product’s support period”. Remedies depend on the risk and can include workarounds or configuration guidance (FAQ 4.3.1). Second, the last row means your intake and triage must keep working after the end date. Guidance para 210 says reporting obligations “continue to apply after a product with digital elements is no longer supported”. A report on an unsupported product still goes through the ENISA single reporting platform, and our CRA vulnerability reporting template covers the forms.

The CRA also leaves room after the end date. Recital 61 says manufacturers “should consider” releasing source code, either to companies that commit to extending vulnerability handling or to the public. Guidance footnote 19 confirms you may continue fixing earlier versions on a paid basis, because the CRA does not require free updates for them once a free upgrade exists. Article 13(11) allows public archives of old versions, provided users are told about the risks of using unsupported software.

Substantial modifications do not reset the clock by default

In plain terms: a major update makes you look at the period again, but usually leaves the end date where it was.

A substantially modified product counts as a new placing on the market, but the guidance says this “does not automatically result in the support period being reset, or even extended” (para 133). The test is whether the change affects the factors that set the expected use time. If the expected use time depended mainly on hardware durability and you changed only software features or a cloud back end, the period aligns with the remaining expected use time (para 134; examples 54 and 55, a robot vacuum and industrial machinery with a rebuilt cloud back end). If the change extends the product’s life, for example a new computing platform in a PLC, you recalculate (para 135; example 56). Either way, file the reassessment with the record below. Software versions are the case to watch: under para 128 each substantially modified version placed on the market needs its own declared period, so for software the reassessment usually ends in a new end date for the new version.

Where the end date must be shown, and what a gap costs

In plain terms: the date goes in three places for buyers and one for regulators, and missing it is an Article 13 breach.

  • At the time of purchase. Article 13(19): the end date, “including at least the month and the year”, must be “clearly and understandably specified at the time of purchase in an easily accessible manner and, where applicable, on the product with digital elements, its packaging or by digital means”. In practice, that points to the web shop page, the quote or order confirmation, and the label or box where you have one.
  • In the user information. Annex II point 7: “the type of technical security support offered by the manufacturer and the end-date of the support period during which users can expect vulnerabilities to be handled and to receive security updates”. State the type of support as well as the date, for example “security updates for firmware versions 3.x”.
  • On the product at the end. Article 13(19), second subparagraph: where technically feasible, display a notification that the product has reached the end of its support period.
  • In the technical documentation. Annex VII point 4: “relevant information that was taken into account to determine the support period”. Recital 59 says it should be provided to market surveillance authorities on request.
Breach Maximum administrative fine Basis
Non-compliance with Annex I or the obligations in Articles 13 and 14 (this includes 13(8) and 13(19)) EUR 15 million or 2.5% of worldwide annual turnover, whichever is higher Art 64(2)
Incorrect, incomplete or misleading information to notified bodies or market surveillance authorities in reply to a request EUR 5 million or 1% of worldwide annual turnover, whichever is higher Art 64(4)

Expect your figures to be compared with your competitors’ figures. Under Article 52(16), the market surveillance authorities’ cooperation group (ADCO) must publish statistics on average support periods by product category and guidance with indicative periods. If the data shows inadequate periods for a category, the Commission may adopt delegated acts setting a minimum for that category (Article 13(8), fourth subparagraph).

Support-period determination record (template)

Copy one record per product model and version, or per batch where batches have different end dates. File it in the technical documentation under Annex VII point 4. The fields map to the factors in Article 13(8). The extra fields cover how the date is published and what happens at the end.

Field What to write Anchor
1. Product, model, version or variant Name plus the identifiers users see Art 13(8)
2. Placing on the market Date or batch (hardware); release date of the version (software) Guidance paras 11, 14; FAQ 4.5.3
3. Intended purpose and nature Use, setting (consumer, office, industrial), hardware durability Art 13(8) 2nd subpara
4. Reasonable user expectations Field service life, warranty and contract terms, replacement cycles, with sources Art 13(8) 2nd subpara
5. Union law on lifetime Instrument and minimum, or “none identified” Art 13(8) 2nd subpara
6. Peer support periods Named comparable products and their published periods Art 13(8) optional
7. Operating environment OS, runtime or platform and its end of support Art 13(8) optional
8. Core third-party components Each component’s supplier support end date; plan if it ends first Art 13(8) optional; FAQ 4.3.7
9. Guidance consulted Commission guidance and ADCO guidance, with dates Art 13(8) optional
10. Decision Length, end date (month and year), proportionality note, reason for any gap to the expected use time Art 13(8), 13(19)
11. Under five years? Evidence that expected use time is shorter; otherwise “not applicable” Art 13(8) 3rd subpara; Recital 60
12. Publication Where the end date appears at purchase, the Annex II point 7 wording, the on-product or packaging location Art 13(19); Annex II point 7
13. End-of-support notice How users are notified, or why it is not technically feasible Art 13(19) 2nd subpara
14. Software version policy Whether Article 13(10) is used, the free upgrade path, the additional-costs check Art 13(10); guidance paras 129-131
15. After the end date Update archive until the 13(9) date, documentation retention, Article 14 intake, source-code or paid-support options Art 13(9), 13(13), 14; Recital 61
16. Approval and review Owner, date, review triggers (substantial modification, component end-of-life notice, ADCO data) Guidance paras 133-135

Buyer checklist: what NIS2 entities should ask suppliers

In plain terms: for NIS2 entities, the supplier’s support period is an input to your own procurement records. Ask for the date, check it, and plan the replacement.

The Implementing Regulation (EU) 2024/2690 requires the processes for acquiring ICT products and services for components that are critical to the entity’s network and information system security to include “requirements regarding security updates throughout the entire lifetime of the ICT services or ICT products, or replacement after the end of the support period” (Annex point 6.1.2(b)). That regulation binds digital infrastructure and digital service providers such as cloud, data centre and managed service providers (Article 1). For other entities, the NIS2 Directive sets the same themes at a higher level: supply chain security in Article 21(2)(d), vulnerability handling in acquisition in Article 21(2)(e), and the overall quality of suppliers’ products in Article 21(3). National law adds the detail.

  1. Ask for the end date, not the length. Month and year for the exact version or batch you are buying (Art 13(19)). “Five years” says nothing if the version was released three years ago.
  2. Read the Annex II point 7 statement. Check which components and versions the support covers. A date with no scope is weak evidence.
  3. Check the date against your planned use. If you will run the product for longer than the supplier will support it, record the replacement date now. That is the “replacement after the end of the support period” in CIR 6.1.2(b).
  4. Ask about the version policy. If the supplier relies on Article 13(10), find out what upgrading costs you. Under the guidance, new hardware is an additional cost. Testing time is not.
  5. Ask about core components. Which third-party components does the product depend on, and what is the plan if one goes out of support first (FAQ 4.3.7)?
  6. Ask how you will be told. End-of-support notifications (Art 13(19)), security advisories (Annex I Part II point 8) and the single point of contact for reporting vulnerabilities (Art 13(17)).
  7. Put it in the contract where appropriate. CIR 5.1.4(a) and (f) list cybersecurity requirements and an obligation to handle vulnerabilities as contract terms “where appropriate”. Ask for any paid extended support in writing.
  8. Record it. Add the end date to your asset register and set a review before it, so the end date does not arrive unnoticed. For the systems already past their end date, see our guide to NIS2 legacy systems and the patching derogation.

Before 11 December 2027 a supplier has no CRA duty to publish an end date, because Article 13 does not apply until then. Ask anyway. A supplier that cannot name a planned end date for products shipping in 2028 is telling you something about its readiness.

Who does what

Role Manufacturer side Buyer side (NIS2 entity)
Product owner / CISO Collects use-time and component evidence; owns fields 3-9 of the record Checks supplier end dates against planned use; flags gaps
Compliance officer / legal Owns the decision record, the 13(19) wording and Annex II point 7 text Writes the support-period terms into acquisition policy and contracts
Board / management Approves support periods per product line and funds support for the whole period Approves replacement budgets tied to supplier end dates
Procurement / sales operations Shows the end date at the point of sale, per version or batch Asks the checklist questions before purchase

FAQ

Is five years the default CRA support period?

No. Article 13(8) sets five years as a minimum, and the Commission’s guidance says it “is therefore not to be considered as the default” (para 126). The period should reflect how long the product is expected to be in use, which for routers, operating systems and industrial control systems is often longer (Recital 60).

Can a CRA support period be shorter than five years?

Only where the product is expected to be in use for less than five years. Then the period equals the expected use time. The FAQ’s examples are a pandemic contact-tracing app and subscription software that stops working when the subscription ends.

Does a major update reset the support period?

Not automatically. A substantial modification requires a reassessment. The period is recalculated where the change affects the factors behind the expected use time (guidance paras 133-135). Software is different: each substantially modified version placed on the market needs its own declared period (para 128).

What happens when the support period ends?

The duty to handle vulnerabilities under Annex I Part II ends with the support period. Security updates already released stay available for at least 10 years after issue (Article 13(9)), documentation is kept for 10 years after placing on the market or the support period, whichever is longer (Article 13(13)), and Article 14 reporting continues (guidance para 210).

Do products sold before 11 December 2027 need a support period?

Not unless they are substantially modified from that date (Article 69(2)). Article 14 reporting applies to them anyway. New units of an old model placed on the market from that date do need one.

Next step

Pick one product line and fill in the record above for the version or batch you will ship first after 11 December 2027. Fields 4 and 8 usually take longest, because they need field data and component end dates from suppliers, so start those now. Then decide where the end date will appear at the point of sale. For how the support period fits with the CRA’s other duties and dates, see our Cyber Resilience Act compliance guide.

This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.

Sources

  1. European Parliament and Council. Regulation (EU) 2024/2847 (Cyber Resilience Act), Articles 3(20), 13, 31, 52(16), 64, 69 and 71, Annexes I, II and VII, Recitals 59-62. Official Journal of the European Union, 20 November 2024
  2. European Commission. Commission guidance on the application of Regulation (EU) 2024/2847 (Cyber Resilience Act), C/2026/6013, section 5 (paras 125-135 and footnotes 17-19) and paras 11, 14, 33 and 210. Official Journal C, 17 November 2026
  3. European Commission services. FAQs on the Cyber Resilience Act, version 1.4 (4 September 2026), entries 4.3.1, 4.3.7 and 4.5.1-4.5.3
  4. European Commission. Implementing Regulation (EU) 2024/2690, Article 1 and Annex points 5.1.4 and 6.1.2. Official Journal of the European Union
  5. European Parliament and Council. Directive (EU) 2022/2555 (NIS2 Directive), Article 21(2)(d), (e) and 21(3). Official Journal of the European Union
  6. European Commission, Energy Efficient Products. Do Android update requirements cover only minor versions, or must devices be updated to the latest major OS version too? (Regulation (EU) 2023/1670)
Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

Don't miss: