NIS2 Secure SDLC: What CIR 2024/2690 Section 6.2 Requires From Your SAST, DAST, and Code Review Pipeline
Most NIS2 guides paraphrase ISO 27001. This one maps CIR 2024/2690 Section 6.2’s actual sub-points to your SAST, DAST, and code review pipeline.
Most NIS2 guides paraphrase ISO 27001. This one maps CIR 2024/2690 Section 6.2’s actual sub-points to your SAST, DAST, and code review pipeline.
Your SCADA network isn’t exempt from NIS2 Article 21. Map CIR Annex 6 to the Purdue Model and get compensating controls for PLCs you can’t patch.
NIS2 crisis management plan: what CIR Annex 4.3 requires, when to activate it, and the Gold-Silver-Bronze structure that satisfies it.
Most NIS2 teams either audit every vendor or skip due diligence entirely. Here’s the tiered Article 21(2)(d) method that fits both budgets and auditors.
Most NIS2 disaster recovery plans get RTO and RPO backwards. Here’s the CIR Annex 4.1 8-field build, the MTPD-first order, and real cloud failover steps.
The EU Cyber Resilience Act makes 24-hour vulnerability reporting mandatory from 11 September 2026. A manufacturer’s guide to scope, Article 14, and penalties.
NIS2 backup policy: CIR 2024/2690 doesn’t mandate “air-gapped backups” — Annex 4.2’s real requirements, RPO/RTO calculation, and the 3-2-1-1-0 rule explained.
NIS2 doesn’t name SBOM, but CIR 2024/2690 Section 6.1.2(c) does. See the 7 required fields and how to get SBOMs from in-house teams and vendors.
NIS2 zero trust, mapped: the 7 NIST SP 800-207 pillars matched to exact CIR 2024/2690 Annex 6 and 11 controls, plus a 6-step implementation roadmap.
Why your PLC’s asset inventory needs a different method than your laptop’s — Article 21 mapped level by level, from field sensors to safety systems.