Quantitative Risk Analysis Under NIS2: FAIR Fully Covers 3 of CIR 2.1.2’s 10 Duties, and ENISA Still Lists a Risk Register
In short
- Quantitative risk analysis is allowed under NIS2 but not required: CIR 2024/2690 Annex point 2.1.2(a) says only “follow a risk management methodology” and never uses the words “quantitative” or “qualitative”.
- FAIR can carry the analysis and evaluation duties in 2.1.2(e) and (f), and it gives you the cost-versus-benefit input that 2.1.3 asks for.
- ENISA’s evidence examples still include a list of main risks, a treatment plan, approval records and a risk register.
- Checked against: CIR 2024/2690, ENISA Technical Implementation Guidance v1.0, NIST IR 8286A Rev. 1.
Some security teams assume NIS2 wants every risk expressed in euros. Others assume an auditor will reject anything but a colour-coded register. The binding text supports neither view. Commission Implementing Regulation (EU) 2024/2690 asks for an “appropriate risk management framework” and tells you to “follow a risk management methodology”, and it names no method. So FAIR is a lawful choice for the analysis. On its own, though, it does not produce the records the rest of point 2.1 asks for: a documented list of risks, a treatment plan with owners and dates, and a written acceptance of residual risk. Below you will find what point 2.1 actually requires, how FAIR works in practice, a duty-by-duty coverage table, the evidence auditors look for, a hybrid design, and a worked example with every assumption stated.
Who this applies to, and what CIR point 2.1 asks for
Plain-language summary: EU law tells you to run a documented risk process with a method you choose. It does not tell you whether that method should produce colours, scores or euros.
| Your situation | Which text sets the detail | What it says about method |
|---|---|---|
| DNS, TLD, cloud, data centre, CDN, managed service and managed security service providers, online marketplaces, search engines, social networks, trust service providers | CIR 2024/2690, Article 1 and Annex point 2.1 | “follow a risk management methodology” (2.1.2(a)); no method named |
| Any other essential or important entity | Article 21 of Directive (EU) 2022/2555 as transposed in your Member State | “policies on risk analysis and information system security” (Art 21(2)(a)); national rules may add detail |
| German entities that use IT-Grundschutz++ | BSI-Standard 300-1 (a BSI method standard, not the NIS2 law itself) | assessment “qualitativ, quantitativ oder hybrid” |
The table shows that no text in the chain prescribes a method, and that one national agency explicitly lists quantitative and hybrid analysis alongside qualitative analysis.
Get the NIS2 Article 21 Compliance Checklist
90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.
We counted the terms in the official English texts. In CIR 2024/2690, “quantitative” and “qualitative” each appear zero times, and so do “risk register” and “Monte Carlo”. In the NIS2 Directive, both words appear once, in the same sentence of Article 18(3). That sentence is about the methodology ENISA uses for its own report on the state of cybersecurity in the Union, not about entities.
Here is what point 2.1 does bind. Under 2.1.1, entities must “perform and document risk assessments”, establish and monitor a risk treatment plan, and have assessment results and residual risks accepted by management bodies or by accountable persons who report to them. Point 2.1.2 then lists ten duties, (a) to (j), set out in the table further down. Point 2.1.3 requires treatment choices to weigh “the cost of implementation in relation to the expected benefit”. Point 2.1.4 requires a review at least annually. The ENISA Technical Implementation Guidance does not pick a method either. Its advice is “Select a risk management methodology”, with a footnote pointing to the ENISA Compendium of Risk Management Frameworks. The same document states that entities “may choose alternative methods to fulfil a requirement”.
The Directive does define risk in a way that suits a frequency-and-loss model. Article 6(9) calls risk “the potential for loss or disruption caused by an incident”, “expressed as a combination of the magnitude of such loss or disruption and the likelihood of occurrence of the incident”. A 5×5 grid and a FAIR model both fit that definition. They differ in what they record and in how they can be checked.
FAIR in practice: frequency, magnitude, ranges and Monte Carlo
Plain-language summary: FAIR asks two questions about each loss scenario: how often a loss will happen, and how much it will cost when it does. Answers are given as ranges, and a simulation turns those ranges into a spread of possible annual losses.
The Open Group’s 2009 Risk Taxonomy Technical Standard defines risk as “the probable frequency and probable magnitude of future loss”. The frequency side is Loss Event Frequency (LEF), “the occurrence, within a given timeframe, that a threat agent will inflict harm upon an asset”. LEF is driven by two factors. Threat Event Frequency covers how often a threat agent acts against the asset. Vulnerability is “the probability that an asset will be unable to resist the actions of a threat agent”. The magnitude side covers the losses that follow. The current Open FAIR standards are O-RT and O-RA; we quote the 2009 text, which is freely archived, plus The Open Group’s own summary of the 2020 update.
That 2020 Open Group summary of O-RA 2.0 describes five stages:
- Scope a loss scenario: stakeholder, asset, threat community, threat event and loss event.
- Estimate Loss Event Frequency top-down. You only break it into smaller factors if a control or a decision-maker needs that detail.
- Estimate Loss Magnitude as primary loss plus secondary loss. Secondary Loss Event Frequency is a conditional probability, not a count per year.
- Derive and articulate risk, either as the Monte Carlo distribution or as a summary such as the “average, most likely value, loss exceedance result, or the maximum/minimum simulated loss”.
- Model the effect of controls, split into loss prevention controls and loss mitigation controls.
Ranges are the core of the method, not a refinement. The 2009 standard says estimates “should be provided as ranges (e.g., “a threat event frequency of 1 to 10 times per year”)”. If you use labels such as “high” or “low”, it says they “should ideally be mapped to a predefined set of quantitative ranges”. NIST IR 8286A Rev. 1 (December 2025) shows the arithmetic with three-point estimates. In its phishing example the optimistic impact is $35,000, the most likely $50,000 and the pessimistic $80,000. Weighting the most likely value four times gives (P + 4M + O) / 6 = $52,500. NIST adds that Monte Carlo can run “perhaps several hundred thousand cycles”, and also that “Simulation is not always necessary”. Open FAIR is “agnostic on the distribution type used”. The FAIR Institute calls PERT-like three-point estimation and Monte Carlo “foundational to the FAIR model”.
In our own runs, the main risk is not the arithmetic. It is the untested assumption behind each range. The worked example below shows why.
FAIR against the ten duties of point 2.1.2
Plain-language summary: FAIR fully covers three of the ten duties, partly covers five, and does not touch two. The gaps are mostly about records, owners and dates, not about numbers.
| CIR 2.1.2 duty | What a FAIR analysis delivers | Coverage | What you still add |
|---|---|---|---|
| (a) follow a risk management methodology | A published, documented method (Open FAIR) | Full | Your written procedure, including when FAIR is used |
| (b) risk tolerance level in line with risk appetite | A way to state tolerance as money and probability | Partial | A tolerance decision by management |
| (c) establish and maintain risk criteria | A common unit (euros per year) | Partial | Criteria for priority and acceptance, written down in money and probability |
| (d) identify and document risks, all-hazards, incl. third parties and single points of failure | Deep analysis of scenarios you have already chosen | Partial | The full list of risks, incl. non-cyber hazards |
| (e) analyse threat, likelihood, impact and risk level, with threat intelligence and vulnerabilities | Threat Event Frequency, Vulnerability, Loss Event Frequency, Loss Magnitude, the annual loss distribution | Full | Sources for each range |
| (f) evaluate risks against the risk criteria | A direct comparison of loss exceedance with the criteria set under (c) | Full | The same comparison for risks outside the model |
| (g) identify and prioritise treatment options and measures | Stage 5 control modelling: risk before and after | Partial | The choice among avoid, reduce or accept |
| (h) continuously monitor implementation | Nothing | None | Tracking in the treatment plan |
| (i) who implements the measures, and when | Nothing | None | Owners and deadlines |
| (j) treatment plan and reasons for accepting residual risk “in a comprehensible manner” | Numbers that can support the reasons | Partial | The plan itself, and reasons a board member can follow |
The pattern is plain. FAIR is strongest where the CIR asks for analysis, (e) and (f), and weakest where it asks for administration, (h) and (i). Its biggest advantage sits just outside the list. Point 2.1.3 asks for “the cost of implementation in relation to the expected benefit”, and a qualitative grid cannot state an expected benefit in euros. FAIR can.
ENISA’s evidence example for the method itself confirms where the line falls. It asks for a “Documented risk-management methodology and/or tools that take into account at least elements (a) to (f) in point 2.1.2”. A FAIR model fully covers (a), (e) and (f), the evaluation in (f) running against criteria written under (c). It still needs the tolerance, criteria and identification work for (b), (c) and (d).
What auditors still expect to see
Plain-language summary: An auditor checks documents and signatures, not a simulation. ENISA’s evidence examples read like the contents of a risk register and a signed treatment plan.
These are the evidence items ENISA lists under point 2.1. ENISA calls its guidance non-binding, and so do we:
| Evidence ENISA lists | Where it sits in ENISA’s guidance | Comes out of a FAIR tool? |
|---|---|---|
| Documented risk management framework; documented results from previous risk assessments | 2.1.1 | Results yes, framework no |
| Treatment plan with risk description, option, assets, measures, effectiveness check, “implementation timelines” and “responsible roles” | 2.1.1 guidance | No |
| Record of approval of assessment results and of residual risks | 2.1.1 | No |
| “List of the main risks described at a high level, including underlying threat(s) and unaddressed vulnerabilities” | 2.1.2 | Only for modelled scenarios |
| Review change logs for the assessment and treatment plan | 2.1.4 | No |
| “Risk register” | Tips closing section 2.1 | No |
Four of the six evidence rows are records a FAIR tool does not produce at all, and the other two only in part. A FAIR programme still needs the register and the signatures.
One national example shows the register fields an auditor may test. BSI-Standard 300-1 (version 1.0, 20 October 2026) lets users choose their own risk procedure, as long as it meets the binding minimum criteria in its Annex 3. Criterion 15 lists the minimum register fields: a unique ID, the object examined, a risk description, the protection goals affected, the risk level and the risk owner. For risks that will be treated, it adds the priority, the treatment option and a reference to the measures. A FAIR result fills one of those fields, the risk level. The BSI standard binds users of IT-Grundschutz++, not every NIS2 entity, but it shows the level of detail a national authority sets as the minimum for a register.
ENISA also gives quantification a job at the acceptance step. Its tips say a decision to accept risk “should be clearly documented, supported by a realistic estimation of potential costs and including financial provisions”. Its examples of risk tolerance, which are separate from its acceptance-criteria examples, are written in money and time: “up to two hours of downtime per month”, “up to EUR 100,000 in recovery costs” and “5% of annual revenue”.
EUR 50,000 is ENISA’s example threshold for risk acceptance criteria: “losses under EUR 50,000 accepted without further action”. A criterion stated in euros can only be applied if someone estimates the loss in euros.
Source: ENISA, Technical Implementation Guidance v1.0, point 2.1.2 guidance
So the practical answer is this: FAIR works as the method behind point 2.1. Auditors will still ask for the register, the treatment plan and the signatures, because those are what ENISA lists as evidence.
The hybrid: FAIR for the top 10, a qualitative register for the rest
Plain-language summary: Keep one register for all risks. Run FAIR only on the handful of risks where a euro figure changes a decision, and write the results back into the same register rows.
NIST describes the same flow: once probability and impact have been estimated, “the information is recorded in the risk register”. The BSI standard adds a design constraint that matters for a hybrid. Its first minimum criterion requires “ein einheitliches Verfahren”, one uniform procedure, for identifying and evaluating risks. Two methods kept side by side without a written link between them would sit uneasily with that. So document the hybrid as one procedure with two tiers and a crosswalk between them.
| Step | What you do | Who owns it | Effort |
|---|---|---|---|
| 1. Register everything | Identify all risks, all-hazards, and rate them on your existing likelihood and impact scales (2.1.2(d)-(f)) | Risk lead with asset and process owners | Medium |
| 2. Select the quantitative tier | Select up to 10 risks in total, drawn from those rated High or Critical, those needing a treatment decision over a set budget, and those the board has asked about; if more qualify, take the largest treatment decisions first | CISO, approved by management | Low |
| 3. Model each selected risk | FAIR stages 1-5 with ranges, sources and assumptions written down | Analyst with finance and operations input | High |
| 4. Write results back | Mean annual loss, 90th percentile, probability of exceeding tolerance, model date and author, and the band derived through the crosswalk, all in the register row | Risk lead | Low |
| 5. Decide and sign | Treatment plan with owners and dates; acceptance with reasons (2.1.1, 2.1.2(i)-(j)) | Management body or accountable person | Low |
The five steps keep one register and one sign-off route, and add FAIR only where a decision depends on money.
Advice differs by role. A CISO should cap the quantitative tier. Ten well-sourced models beat forty guesses, and the 2009 standard says the choice between qualitative and quantitative values should be “driven by the needs and desires of those who will receive or base their decisions on the analysis results”. A compliance officer should check that every modelled risk still has a full register row and that the crosswalk is written in the methodology document, so an auditor can trace a euro figure to a band. The management body, which must approve the risk-management measures under Article 20(1), should approve the tolerance in money and probability as well as in colours. Then a breach of tolerance becomes a fact anyone can check, not a matter of opinion. For a small business owner without an analyst, a three-point estimate in a spreadsheet for two or three risks already serves the cost-versus-benefit duty in 2.1.3.
Worked example: ransomware through an MSP’s remote-management platform
Plain-language summary: One scenario, run as 100,000 simulated years. Multiplying the most likely values gives less than half the simulated mean annual loss, and the treatment decision follows directly from the tolerance.
The entity is a managed service provider, so CIR 2024/2690 applies directly. The scenario: a ransomware group gets into the remote monitoring and management platform and encrypts systems at the provider and at some of its clients. Every number below is an assumption made for this example, not a benchmark. Replace each one with your own incident history, your insurer’s data and your finance team’s figures.
| Factor (FAIR term) | Minimum | Most likely | Maximum |
|---|---|---|---|
| Threat Event Frequency (attempts reaching the platform per year) | 0.5 | 2 | 6 |
| Vulnerability (share of attempts that become loss events) | 5% | 10% | 25% |
| Primary loss per event (response, restoration, lost revenue) | €150,000 | €400,000 | €1,500,000 |
| Secondary loss event probability (client claims, contract penalties) | 30% | 40% | 60% |
| Secondary loss per event | €100,000 | €300,000 | €2,000,000 |
Method: each range is a Beta-PERT distribution, loss events per simulated year are drawn from a Poisson count, and we ran 100,000 simulated years (random seed 2026; another seed moves the results by a few per cent). The organisation’s tolerance, approved by management, is at most a 5% chance per year of losing more than €1 million on any single scenario.
The results, before treatment:
- In 76% of simulated years, no loss event happens, so the median year costs nothing.
- The mean annual loss is about €218,000, and the 90th percentile is about €893,000.
- The probability of losing more than €1 million in a year is 8.3%, which is above the 5% tolerance.
Now compare a shortcut many teams take: multiply the most likely values. That gives 2 × 10% × (€400,000 + 40% × €300,000) = €104,000 a year, less than half the simulated mean. The cause is skew. The maximum losses sit far above the most likely ones, and a PERT mean weights them as (minimum + 4 × most likely + maximum) / 6, the same weighting NIST shows for three-point estimates. A register that records only the €104,000 figure would understate this risk.
Proposed treatment: phishing-resistant MFA on platform administration, network isolation of the platform, and immutable backups, at an assumed €90,000 a year. We model it as lower Vulnerability (2%, 4%, 10%) and lower primary loss (€100,000, €250,000, €600,000). After treatment, the mean annual loss falls to about €57,000 and the chance of losing more than €1 million falls to 1.4%, inside tolerance. The expected benefit is about €161,000 a year against €90,000 of cost. That is the comparison point 2.1.3 asks you to “take into account”. It informs the decision but does not decide it.
In the register, the row keeps your normal fields: ID, asset, description, owner, treatment option, measures, deadline. It adds the quantitative fields from step 4 of the hybrid: mean annual loss, 90th percentile, probability of exceeding tolerance, and the date and author of the model, plus the band that the crosswalk in your methodology derives from them. For example, the likelihood band comes from the annual probability of at least one loss event (here about 24% before treatment and 10% after). The impact band comes from the mean loss per event (here about €770,000 before and €510,000 after). The acceptance record states in words what the board signs: residual risk inside the approved tolerance, at a 1.4% modelled chance of a loss above €1 million, based on the assumptions in the table and reviewed at least annually under point 2.1.4.
Five mistakes when bringing FAIR into a NIS2 programme
- Calling the model “NIS2-compliant”. Neither the Directive nor the CIR names FAIR or any other method, so no method is compliant on its own. Compliance comes from the whole process in point 2.1.
- Dropping unmodelled risks from the register. Point 2.1.2(d) still requires all risks to be identified and documented, including those from third parties and single points of failure.
- Showing the board one number. The mean hides the tail. Report the mean, the 90th percentile and the chance of breaching tolerance. Under 2.1.2(j), the reasons for accepting residual risk must be “comprehensible”. O-RA 2.0 covers “Translating Quantitative Results into Qualitative Statements” for exactly this purpose.
- Leaving out the assumptions. O-RA 2.0 lists “Documenting assumptions and rationale” as a quality topic. ENISA wants acceptance “supported by a realistic estimation of potential costs”. An estimate without its sources is neither checkable nor realistic.
- Running two methods without a crosswalk. If euro results and colour bands never meet, you have two procedures, not one. Write down the mapping between ranges and bands; the 2009 taxonomy says labels should ideally be mapped to predefined quantitative ranges (“Medium = 1 to 10”).
Frequently asked questions
Does NIS2 require quantitative risk analysis?
No. CIR 2024/2690 point 2.1.2(a) requires you to “follow a risk management methodology” and names none. The words “quantitative” and “qualitative” do not appear in the Regulation. Both approaches are open to you, and so is a hybrid.
Is FAIR enough on its own to satisfy CIR point 2.1?
No. FAIR fully covers 2.1.2(a), (e) and (f), provided your criteria under (c) are written in money. You still need a full risk list, a treatment plan with owners and dates, and the acceptance records that ENISA lists as evidence.
Do we need Monte Carlo software?
Not necessarily. NIST IR 8286A Rev. 1 says “Simulation is not always necessary”. A three-point estimate in a spreadsheet can already serve the cost-versus-benefit duty in point 2.1.3. Simulation adds the tail: the chance of a very bad year.
How often should the FAIR models be re-run?
At least annually, and whenever there are significant changes to operations or risks, or a significant incident. That is the review cycle point 2.1.4 sets for the assessment results and the treatment plan.
For the register those results land in, see the risk register structure and governance hierarchy behind Article 21(2)(a). For the wider process, see our NIS2 risk assessment guide. For which entities the CIR binds, see Article 21(2)(a) risk management requirements. If your register still runs on a grid, our 5×5 risk matrix template shows where multiplied scores break, and residual risk documentation covers the acceptance record.
Your next step: pick the three register risks that cost you the most debate at the last review. Write a minimum, most likely and maximum for their frequency and loss, with a source for each number. Then compare the mean and the 90th percentile with a tolerance your management has approved in euros.
This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.
Sources
- Commission Implementing Regulation (EU) 2024/2690, EUR-Lex
- Directive (EU) 2022/2555 (NIS 2 Directive), EUR-Lex
- NIS 2 Directive, Article 6: Definitions (OJ text)
- NIS 2 Directive, Article 18: Report on the state of cybersecurity in the Union (OJ text)
- NIS 2 Directive, Article 20: Governance (OJ text)
- NIS 2 Directive, Article 21: Cybersecurity risk-management measures (OJ text)
- ENISA, Technical Implementation Guidance on Commission Implementing Regulation (EU) 2024/2690, version 1.0, June 2025
- ENISA, Compendium of Risk Management Frameworks with Potential Interoperability
- NIST IR 8286A Rev. 1, Identifying and Estimating Cybersecurity Risk for Enterprise Risk Management, December 2025
- The Open Group, Technical Standard: Risk Taxonomy (C081), January 2009 (archived copy)
- The Open Group Blog, J. Linford, Updates to the Open FAIR Body of Knowledge, Part 2, December 2020
- FAIR Institute, Our Feedback on NIST IR 8286 Drafts
- BSI-Standard 300-1, Methodik Grundschutz++, version 1.0, October 2026
Get the NIS2 Article 21 Compliance Checklist
90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.