Risk Matrix for NIS2: ‘Matrix’ Appears 0 Times in the CIR — What 2.1 Asks for Instead, With a 5×5 Template

In short

  • A risk matrix is not required by NIS2: the word “matrix” appears 0 times in CIR 2024/2690 and 0 times in the Directive.
  • CIR Annex point 2.1.2 asks instead for a methodology, a risk tolerance level, risk criteria, and an evaluation of each risk against those criteria.
  • A 5×5 matrix can serve as part of those criteria, but a multiplied grid gives a rare catastrophic risk the same score as a frequent trivial one.
  • Checked against: CIR 2024/2690, Directive (EU) 2022/2555, NIST SP 800-30 Rev. 1.

Check two cells in your risk matrix: likelihood 1 with impact 5, and likelihood 5 with impact 1. In a multiplied 5×5 grid both score 5. A rare event that could shut down your main service ends up in the same band as a monthly nuisance. NIS2 does not make you keep that grid. Commission Implementing Regulation (EU) 2024/2690 never uses the word “matrix”. Its Annex point 2.1.2 asks for a risk management methodology, a risk tolerance level, risk criteria, and an evaluation of each risk “based on the risk criteria”. A 5×5 matrix can carry part of that load if you build it as a set of criteria, not as a colour chart. Below you will find what point 2.1 asks for, which of its ten duties a matrix covers, where multiplication breaks, and a 5×5 template with the criteria that sit beside it.

What CIR Annex 2.1 asks for instead of a matrix

Plain-language summary: EU law asks you to judge each risk against criteria you have written down and approved. The law leaves the format to you. A matrix is one acceptable format, a spreadsheet of scores is another, and a narrative method can work too, as long as the criteria are explicit.

Start with who is bound. Commission Implementing Regulation (EU) 2024/2690 (the CIR) applies directly only to the provider types listed in its Article 1. These are DNS service providers, TLD name registries, cloud computing, data centre and content delivery network providers, managed service and managed security service providers, online marketplaces, online search engines, social networking services platforms and trust service providers. Every other essential or important entity is bound by Article 21(2)(a) of the Directive, “policies on risk analysis and information system security”, as written into national law. For those entities, the CIR Annex is a detailed yardstick, not a binding text. ENISA says its own guidance on the Annex “may be considered useful by other public or private bodies”.

Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

We counted the terms in the English texts of both instruments. The result explains why so many matrix templates miss the point:

Term CIR 2024/2690 (whole text) Directive (EU) 2022/2555 Where it sits in the CIR
matrix 0 0 Nowhere
risk criteria 2 0 Annex 2.1.2(c) and (f)
risk tolerance 1 0 Annex 2.1.2(b)
risk appetite 1 0 Annex 2.1.2(b)
risk acceptance criteria 1 0 Annex 2.3.3
likelihood 3 4 A proportionality recital, Article 2(2), Annex 2.1.2(e)

0 occurrences of the word “matrix” in the text of CIR 2024/2690. The Annex names risk criteria, a tolerance level and acceptance criteria instead.

Source: EUR-Lex, Commission Implementing Regulation (EU) 2024/2690, English text, counted 20 November 2026

The Directive does give you a reason to think in two dimensions. Article 6(9) defines risk as “the potential for loss or disruption caused by an incident”, “expressed as a combination of the magnitude of such loss or disruption and the likelihood of occurrence of the incident”. A likelihood-by-impact grid is a natural way to express that combination. The definition does not say how the two are combined, how many levels each has, or where the line between acceptable and unacceptable sits. Point 2.1.2 of the CIR Annex leaves those choices to you: (b) “establish the risk tolerance level in accordance with the risk appetite”, (c) “establish and maintain relevant risk criteria”, (e) analyse “threat, likelihood, impact, and risk level”, and (f) “evaluate the identified risks based on the risk criteria”.

So the question an auditor asks is not “where is your matrix?” but “what are your criteria, who approved them, and do your ratings follow them?”. If you already run the process in our NIS2 risk assessment guide, your matrix is likely the most visible part of your criteria. The next section checks how much of 2.1.2 it actually covers.

The ten duties in point 2.1.2: what a 5×5 matrix covers

A matrix fully covers one of the ten lettered duties, covers five in part, and does nothing for the other four. The table maps each letter. The verbs come from the CIR, and the coverage ratings are our analysis.

Point 2.1.2 What the CIR asks Matrix coverage What you need beside the grid
(a) “follow a risk management methodology” Partial A written method: scope, steps, roles, how scales are applied. The grid is one component of it.
(b) “establish the risk tolerance level in accordance with the risk appetite” Partial An approved appetite statement. The grid can show the tolerance line, but the line has to come from the appetite.
(c) “establish and maintain relevant risk criteria” Partial Scale definitions plus criteria a two-axis grid cannot hold (see the overrides below).
(d) identify and document risks under an all-hazards approach, including third parties and single points of failure None A risk register and threat catalogue.
(e) analyse “threat, likelihood, impact, and risk level, taking into account cyber threat intelligence and vulnerabilities” Partial The grid holds three of the four named elements. Threat, threat intelligence and vulnerabilities belong in the register entry and in the reason given for each likelihood rating.
(f) “evaluate the identified risks based on the risk criteria” Full This is the job a matrix is built for, provided the criteria are written down.
(g) “identify and prioritise appropriate risk treatment options and measures” Partial The band gives a first ranking. Point 2.1.3 adds cost against expected benefit, asset classification (12.1) and the business impact analysis (4.1.3).
(h) “continuously monitor the implementation of the risk treatment measures” None A treatment tracker with status reporting.
(i) identify who is responsible for implementing measures and when None Named owners and dates per measure. Band deadlines are only defaults.
(j) document the risk treatment plan and “the reasons justifying the acceptance of residual risks in a comprehensible manner” None Written reasons. A cell colour is not a reason.

ENISA’s evidence list sets the bar for the first six letters. It asks for a “documented risk-management methodology and/or tools that take into account at least elements (a) to (f) in point 2.1.2”. A CISO who hands over only a heat map has evidence for (f) and fragments of the rest. A compliance officer should check that the methodology document names the matrix as the evaluation tool and points to the criteria behind every scale level. Otherwise the grid is a picture with nothing behind it. For the method itself, ENISA’s guidance points to its Compendium of Risk Management Frameworks, a 2022 survey of established risk management methodologies. For how the register and governance layers fit around the grid, see the risk register structure behind Article 21(2)(a).

Where a multiplied 5×5 fails the criteria duty

The common grid multiplies likelihood (1–5) by impact (1–5) and cuts the product into bands. The grid in our own risk assessment guide does exactly that: 1–4 Low, 5–9 Medium, 10–15 High, 16–25 Critical. It is quick to fill in, and it has three flaws you should know before you defend it.

It has fewer levels than it looks. Twenty-five cells produce only 14 distinct scores. No pair of numbers from 1 to 5 multiplies to 7, 11, 13, 14, 17, 18, 19 or 21 to 24. A score of 4 comes from three different cells (1×4, 2×2 and 4×1), and nine other scores come from two cells each. Your “25-point scale” is really a 14-point scale with gaps.

It treats likelihood and impact as interchangeable. Under those bands, a rare event with major impact (1×4 = 4) falls in Low, whose response in that guide is “accept or monitor”. A rare event with critical impact (1×5 = 5) scores the same as an almost-certain event with negligible impact (5×1 = 5). In our reading, that is a criterion your management body would be accepting under point 2.1.1, whether or not anyone noticed it. Multiplying ordinal labels also assumes that a “4” is twice a “2”, which nobody defined.

The research finds the same weaknesses. Louis Anthony Cox’s peer-reviewed analysis, “What’s wrong with risk matrices?” in Risk Analysis (2008), describes “range compression”, where very different risks receive identical ratings. It also shows that matrices “can mistakenly assign higher qualitative ratings to quantitatively smaller risks”, and that “different users may obtain opposite ratings of the same quantitative risks”. Cox does not conclude that matrices should be banned. He concludes that they “should be used with caution, and only with careful explanations of embedded judgments”. For NIS2 purposes, that explanation is your risk criteria.

Less than 10% of randomly selected pairs of hazards: the share that a typical risk matrix can compare correctly and unambiguously, in Cox’s example.

Source: Cox LA Jr, Risk Analysis 2008;28(2):497-512

Germany’s BSI raises the same consistency problem from the practitioner side. BSI-Standard 200-3 asks organisations to agree the category descriptions with their departments, so that two staff members who rate the same risk reach the same result. It also observes that most users tend to work, in effect, with only two categories per dimension. Here is a test you can run this week. Give three people the same five risks and your scale definitions, and have each rate them alone. Every disagreement of two or more levels points to a scale that needs a better anchor.

The 5×5 template: two scales, a lookup grid and an acceptance line

The fix is not to drop the 5×5. Replace the multiplication with a lookup grid, where each cell gets its band directly, and pin every level to something observable. BSI-Standard 200-3 recommends no more than five categories per dimension, so five is the ceiling, not the minimum. The values in brackets are placeholders. Set them from your approved appetite before first use.

Likelihood scale (expected frequency)

Level Label Anchor Evidence to record (point 2.1.2(e))
1 Rare Less than once in five years No known exploitation in your sector; no matching incidents in your log
2 Unlikely Once in two to five years Seen in your sector, requires capabilities or access an attacker is unlikely to have
3 Possible Once a year to once in two years Recurs in threat reports for your sector, or one near-miss in your own log
4 Likely Several times a year Active campaigns against your sector, or a known vulnerability open on an exposed asset
5 Almost certain Monthly or more often Already happening: repeated events in your own logs

Impact scale (the highest dimension sets the level)

Level Service availability Data Financial Legal, safety, society
1 Negligible Under [1 hour], no customer effect Non-sensitive data only Under [EUR 5,000] None
2 Minor Up to [4 hours] Internal data, limited audience Up to [EUR 25,000] Contractual notice to one customer
3 Moderate Up to [24 hours] Confidential data exposed Up to [EUR 100,000] Regulator notification possible
4 Major Up to [72 hours] or several customers affected Large-scale or special-category data Up to [EUR 500,000] Notification likely; contract penalties
5 Critical Over [72 hours], or the service cannot be restored Integrity of core records lost Above [EUR 500,000] or threatens solvency Harm to people, public safety or other entities

The last column is there because Article 21(1) of the Directive says that, when assessing proportionality, due account shall be taken of “the likelihood of occurrence of incidents and their severity, including their societal and economic impact”. An impact scale that counts only your own losses misses half of that sentence.

Lookup grid: band per cell

Likelihood ↓ / Impact → 1 Negligible 2 Minor 3 Moderate 4 Major 5 Critical
5 Almost certain Low Medium High Critical Critical
4 Likely Low Medium High Critical Critical
3 Possible Low Medium Medium High Critical
2 Unlikely Low Low Medium High High
1 Rare Low Low Low Medium High

Three rules shape the grid. Impact 5 is never below High. Impact 1 is always Low. Impact 2 never rises above Medium. Compared with the multiplied bands above, 6 of the 25 cells change. Four high-impact cells move up (1×4, 1×5, 2×4 and 3×5), and two frequent but low-impact cells move down (5×1 and 5×2). The asymmetry has a published precedent, although this grid goes further. In NIST SP 800-30 Rev. 1, Table I-2, very-low likelihood with very-high impact gives Low risk, while very-high likelihood with very-low impact gives Very Low. Low likelihood with very-high impact gives Moderate. Both grids rank frequent low-impact risks below rare high-impact ones. This template adds an impact floor, so the rare-but-critical cell is High rather than NIST’s Low. NIST presents its scales as a starting point “with appropriate tailoring”, and you should treat this grid the same way.

Band to response

Band Response Default treatment deadline Who may accept the residual risk
Critical Treat; acceptance only as an exception with reasons [30 days] Management body
High Treat [90 days] Management body, or an accountable person with authority where your policy delegates it
Medium Treat or accept after cost-benefit (point 2.1.3) [6 months] Accountable risk owner, reported to the management body
Low Accept and monitor Next review Risk owner, recorded in the register

The acceptance column follows point 2.1.1. Results and residual risks are accepted “by management bodies or, where applicable, by persons who are accountable and have the authority to manage risks, provided that the relevant entities ensure adequate reporting to the management bodies”. The split by band is our design. The duty to ensure adequate reporting to the management body comes from the CIR itself (point 2.1.1).

The criteria the grid cannot hold: overrides and tolerance statements

Point 2.1.2(c) asks for “relevant risk criteria”, and ENISA’s Technical Implementation Guidance defines them as “how the entity evaluates the significance of the risks that it identifies and makes decisions concerning risks”. Its indicative list includes regulatory and legal exposure, reputational impact, risk velocity, recovery complexity, emerging technology risks and stakeholder sensitivity. ENISA also points to ISO/IEC 27005:2022, paragraph 6.4, for more on risk criteria. None of these fits on a likelihood axis or an impact axis. Write them as override rules that move a rating up one band:

  1. Velocity. A vulnerability that is being exploited, or could be exploited before a patch exists. ENISA’s example is “zero-day exploits that can be weaponised before patches are available”.
  2. Single point of failure. Point 2.1.2(d) names it explicitly. A single point of failure means one failed component stops the service, so the rating should not depend on how unlikely that failure looks today.
  3. Third-party concentration. Point (d) singles out risks “in relation to third parties”. One supplier or cloud region carries a critical service with no tested alternative.
  4. Recovery complexity. ENISA gives the example of “cyber-attacks on legacy systems with limited vendor support”.
  5. Stakeholder flag. Risks raised by the board, a regulator or a major customer, which ENISA says to re-evaluate “even if the assessed technical risk is low”.

Point 2.1.2(b) needs a second kind of criterion: tolerance statements in units the business already uses. ENISA’s examples include “up to two hours of downtime per month” for highly critical systems, “up to EUR 100,000 in recovery costs”, and “a maximum of 48 hours for containment”. For acceptance criteria, it gives “losses under EUR 50,000 accepted without further action”. These are ENISA illustrations, not EU thresholds. Their value is that they connect the matrix to an appetite the board has signed. Our guide on risk appetite board documentation covers how to write and approve that statement. Once it exists, the acceptance line on your grid is a consequence of the appetite, not a design choice by the risk team. The BSI annex illustrates the same idea by drawing appetite lines across its risk matrix.

When two risks land in the same band, point 2.1.3 gives the tie-breakers: “the cost of implementation in relation to the expected benefit”, the asset classification in point 12.1, and the business impact analysis in point 4.1.3. If your BIA is not done, our guide on how to conduct a BIA is the place to start, because its downtime figures feed the availability column of the impact scale.

Acceptance, sign-off and the annual review an auditor will check

A matrix becomes evidence only when its outputs are accepted, explained and reviewed. Four clauses decide what an auditor will look for:

  • Point 2.1.1: risk assessment results and residual risks are accepted by the management body, or by accountable persons with authority if the management body receives adequate reporting.
  • Point 2.1.2(j): the reasons for accepting residual risks are documented “in a comprehensible manner”. “Cell 2×3, Medium” is a location, not a reason. A reason reads like this: “Accepted until [date] because compensating control X reduces likelihood to 2; cost of replacement exceeds the expected loss; review if Y happens.” Our guide to residual risk documentation breaks the record into fields.
  • Point 2.3.3: after independent reviews, “corrective actions shall be taken or residual risk accepted according to the relevant entities’ risk acceptance criteria”. Your band-to-response table is those criteria, so it needs to be approved, versioned and applied as written.
  • Point 2.1.4: results and the treatment plan are reviewed “at planned intervals and at least annually”, and when “significant changes to operations or risks or significant incidents occur”.

Point 2.1.4 covers the assessment results and the treatment plan. It does not mention the scales. In practice, though, an annual review that re-scores risks against outdated anchors produces outdated results. If revenue has doubled, a EUR 100,000 impact threshold may no longer mean “Moderate”. Recalibrate the scales in the same annual cycle and record the version used for each rating. Above all of this, Article 20(1) of the Directive requires the management body to approve the risk-management measures and oversee their implementation, so the approved criteria should be traceable to a board decision.

Role Owns Evidence they produce
Management body / board Appetite, tolerance level, acceptance of Critical residual risks, and of High residual risks unless delegated under point 2.1.1 Minuted approval of the criteria and of the annual results
CISO or IT security lead Scales, grid, overrides, likelihood evidence from threat intelligence and vulnerabilities Methodology document and versioned scale definitions
Risk owners Ratings and treatment for their risks Register entries with reasons; treatment status
Compliance officer Mapping to point 2.1.2 (a)–(j), review calendar, calibration test Coverage checklist, review log, results of the three-rater test
SME owner (where owner and board are one person) All of the above, with a short written appetite One signed page of criteria and a dated register

Frequently asked questions

Does NIS2 require a 5×5 risk matrix?

No. Neither the Directive nor CIR 2024/2690 uses the word “matrix” or prescribes a scale size. What the CIR Annex does require of the entities it covers is a methodology, a tolerance level, risk criteria and an evaluation of risks against those criteria (point 2.1.2). A 5×5 matrix is one way to hold part of the criteria.

Is a 3×3 or 4×4 matrix enough?

The EU texts set no minimum. BSI-Standard 200-3 itself uses four categories for frequency and four for damage, and it recommends no more than five per dimension. Fewer levels mean more risks share a cell, so if you choose 3×3, the override rules and written reasons have to do more of the work.

Can we keep multiplying likelihood by impact?

You can, if your criteria say so and management has approved them. Add an impact floor (any impact 5 is at least High) so that rare catastrophic risks cannot fall into an accept-and-monitor band, and explain the choice in the methodology. That is what Cox means by “careful explanations of embedded judgments”.

Does the CIR apply to my organisation?

Only if you are one of the provider types in its Article 1, such as cloud, data centre, managed service or managed security service providers. Other entities follow Article 21 as transposed in their member state, and may find the CIR Annex useful as a benchmark; ENISA says its guidance on the Annex “may be considered useful by other public or private bodies”. Your national rules may add requirements, so check the transposing law.

How often do the matrix and ratings need review?

Point 2.1.4 requires the risk assessment results and the treatment plan to be reviewed at least annually, and also after significant changes or significant incidents. Review the scale anchors in the same cycle so that the ratings stay comparable from year to year.

Your next step: take your current grid and write next to each cell which point 2.1.2 letter it serves. Run the three-rater test on five risks. Then add the impact floor and the five overrides before your next annual review. For the treatment side, see our guide to risk treatment plan options.

This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.