Solar panels and wind turbines as glowing outlines with light threads running from inverter cabinets to a remote point, one passing through a shield, representing NIS2 scope and remote inverter access

Zero Staff, Still in Scope: How NIS2 Sizes Solar, Wind and Battery SPVs — and Who Controls Your Inverters

In short

  • NIS2 covers renewable energy through Annex I’s electricity rows: producers, market participants providing aggregation or energy storage services, and suppliers.
  • Size is measured with the EU SME rules, so a park SPV with no staff is counted together with a majority owner.
  • Article 21(2)(d) makes whoever can remotely reach your inverters a supplier you must assess.
  • Checked against: Directive (EU) 2022/2555, Directive (EU) 2019/944, Recommendation 2003/361/EC.

A solar park company with no employees can be a large enterprise under NIS2 once its owners’ figures are added. The directive does not ask how many megawatts you run or how many people sit at the site. It asks which electricity function you perform, using the definitions in the Electricity Directive, and how big your enterprise is once owners and sister companies are counted. Those two tests decide whether a wind farm, a solar park or a battery store is in scope. A third question decides whether being in scope means anything in practice: who can switch your inverters off from somewhere else. This guide works through all three. For the energy sector as a whole, including grid operators and the gas, oil and hydrogen rows, start with our NIS2 energy sector guide.

Does this apply to you? The Annex I rows a renewables business can hit

Plain-language summary: NIS2 does not have a “renewables” category. A solar, wind or storage business is in scope if it matches one of the electricity entity types in Annex I, and each type borrows its meaning from Directive (EU) 2019/944 or Regulation (EU) 2019/943. One company can match several rows at once.

Annex I, point 1(a) of Directive (EU) 2022/2555 lists seven electricity entity types. Four of them are the ones renewables businesses meet in practice:

Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

Annex I electricity row Definition it borrows Typical renewables business What to watch
Producers Directive 2019/944, Art. 2(38): “a natural or legal person who generates electricity” Owner of a solar park, wind farm, hydro or biomass plant No capacity floor and no exclusion of final customers in the definition
Market participants providing aggregation, demand response or energy storage services Regulation 2019/943, Art. 2(25), plus Directive 2019/944, Art. 2(18), (20) and (59) Battery storage operator trading in electricity markets; virtual power plant or aggregator Applies to the service, so a storage operator can be in scope without generating anything
Electricity undertakings carrying out supply Directive 2019/944, Art. 2(57) and 2(12): “the sale, including the resale, of electricity to customers” Developer selling power directly to corporate or household customers Art. 2(57) excludes final customers
Operators of a recharging point Defined in Annex I itself Solar-plus-charging hub operator providing a recharging service to end users Covers operators responsible for managing and running the point

The producer row matters most, because its definition is so short. Directive 2019/944 defines “generation” as “the production of electricity” and a producer as anyone who generates it. Nothing in Article 2(38) excludes a company that mainly uses its own power. The Smart Energy Expert Group, a Commission expert group, made the same point in its cybersecurity working group’s October 2026 report, which does not represent the Commission’s opinion: unlike “electricity undertaking”, the producer definition “does not exclude final customers”. The Belgian regulator reads it that way too. Its NIS2 FAQ, as summarised by Eversheds Sutherland, says it does not matter whether generation is a side activity or exclusively for own consumption, provided the company passes the size test. On that reading, a large food plant with a grid-connected rooftop array can find itself on an energy-sector register.

The storage row works differently. The market participant definition in Regulation 2019/943, Article 2(25) covers anyone “who is an operator of demand response or energy storage services, including through the placing of orders to trade, in one or more electricity markets, including in balancing energy markets”. A standalone battery that earns money in balancing markets meets that row even though it never counts as a producer. A behind-the-meter battery that only shifts a factory’s own consumption is a different case, and our reading is that it falls outside this row because it trades in no market.

The size test: why a zero-staff SPV can be an essential entity

Plain-language summary: NIS2 applies to medium-sized and large enterprises, measured with the EU’s SME Recommendation. That Recommendation adds the figures of companies that control you, or that you control, to your own. A project company with no employees adds the figures of the companies that control it in full, and those of shareholders holding 25% or more in proportion.

Article 2(1) applies NIS2 to Annex I entities that “qualify as medium-sized enterprises under Article 2 of the Annex to Recommendation 2003/361/EC, or exceed the ceilings for medium-sized enterprises”. Under Article 3(1)(a), Annex I entities above the medium ceilings are essential entities. Medium-sized ones are important entities under Article 3(2), unless they are designated as essential, for example as critical entities under Directive (EU) 2022/2557. Small and micro enterprises fall outside, unless a size-independent rule applies: Article 2(2)(b) to (e), for example where disruption “could induce a significant systemic risk”, or Article 2(3) for entities identified as critical entities under Directive (EU) 2022/2557.

The ceilings come from Recommendation 2003/361/EC. An enterprise is small if it has fewer than 50 staff and its turnover and/or balance sheet total does not exceed EUR 10 million. In practice, that means you are in NIS2 scope from 50 staff, or from a turnover and a balance sheet total that both exceed EUR 10 million. You are a large, essential entity from 250 staff, or from a turnover above EUR 50 million together with a balance sheet above EUR 43 million.

The renewables trap sits in Articles 3 and 6 of the Recommendation’s Annex:

  • Linked enterprises (Article 3(3)): an enterprise that holds a majority of another’s voting rights, or can appoint or remove a majority of its board, is linked to it. Article 6(2) adds “100 % of the data” of linked enterprises.
  • Partner enterprises (Article 3(2)): a holding of 25% or more without control. The partner’s data are added in proportion to the holding.
  • Exempt investors: institutional investors, public investment corporations and venture capital companies can reach 25% without making the company a partner, provided they are not linked to it.
  • Two-year rule (Article 4(2)): crossing a ceiling changes your status only if it happens “over two consecutive accounting periods”.

Take a hypothetical park SPV with no staff, EUR 6 million turnover and a EUR 55 million balance sheet. On its own accounts it is small, because its turnover is below EUR 10 million, and NIS2 does not reach it. Put it 100% under an independent power producer with 400 employees and the parent’s data are added in full. The SPV is now a large enterprise and, as a producer, an essential entity. With a 40% stake held by a utility, it adds 40% of the utility’s figures instead. Article 2(1) of NIS2 also switches off Article 3(4) of the Recommendation, the rule that a company controlled 25% or more by public bodies cannot be an SME. A municipally owned park is therefore not treated as large merely because a public body holds 25% or more; its size is calculated like any other company’s, including its owners’ data under Articles 3 and 6.

EUR 10 million or 2% of worldwide annual turnover, whichever is higher, is the maximum fine Member States must at least provide for when an essential entity breaches Article 21 or 23. The turnover is that of “the undertaking to which the essential entity belongs”, which for a group-owned SPV points to the group (our reading).

Source: Directive (EU) 2022/2555, Article 34(4)

Recital 16 of NIS2 adds the one way out. It states that Member States “are able to take into account the degree of independence an entity enjoys” from partner or linked enterprises, in particular whether it is independent “in terms of the network and information systems” it uses and the services it provides. Recitals do not bind, so this works only where your national authority adopts it. The SEEG report gives the practical version: SPVs whose IT and OT run on systems centralised across the group count as linked, and the plants that stay out are “those that can prove true independence”. If one SCADA or monitoring platform runs every park, independence is hard to argue.

Decision tree: is your solar park, wind farm or battery store in scope?

Plain-language summary: answer these five questions in order. Stop at the first “out of scope” answer, and record the reasoning, because your national authority may ask for it at registration.

  1. Do you generate electricity, sell it to customers, or provide storage, aggregation or demand response in an electricity market? If none of these, the electricity rows do not apply. Check whether you are in scope under another sector, for example as a managed service provider (question 5).
  2. Is the company that does it at least medium-sized, after adding linked and partner enterprises? If not, you are normally out, unless a size-independent rule in Article 2(2) or 2(3) applies. Germany’s transposition is a good example of how national thresholds interact with this; see our guide to Germany’s energy thresholds.
  3. Is it above the medium ceilings? Then it is an essential entity. Otherwise it is important. The duties in Article 21 are the same. Supervision and fine levels differ.
  4. Where is it established? Each Member State keeps its own list under Article 3(3), so a portfolio across three countries usually means three registrations.
  5. Do you install or maintain other people’s plants remotely? NIS2 Article 6(39) defines a managed service provider as an entity providing “installation, management, operation or maintenance” of ICT products “either on customers’ premises or remotely”. The SEEG experts conclude that installers and maintenance providers can fall under Annex I, point 9, ICT service management (business-to-business), as managed service providers. Our guide to MSPs under NIS2 covers those duties.

The remote inverter access problem

Plain-language summary: an inverter that talks to its manufacturer’s cloud, an O&M contractor or an aggregator can be told to change output or shut down from outside your plant. NIS2 does not ban that. It makes you assess and control it as a supply chain risk, because the party holding that access is your supplier.

The Smart Energy Expert Group’s Recommendations to address cybersecurity risk in photovoltaic generation (version 1.1, 1 October 2026) is the most detailed EU-level look at this. It is a consensus of experts that “does not represent the opinion of the European Commission”. It found three high risks:

  • attacks on manufacturer platforms to which PV installations are connected;
  • intentional backdoors placed by the manufacturer on behalf of a nation-state actor, in the platform, the hardware or the firmware;
  • attacks on utility-scale plants through local networks, where the attacker gains access to a remote access firewall.

NIS2 reaches this through two provisions. Article 21(2)(d) requires “supply chain security, including security-related aspects concerning the relationships between each entity and its direct suppliers or service providers”. Article 21(3) then requires entities to “take into account the vulnerabilities specific to each direct supplier and service provider and the overall quality of products and cybersecurity practices of their suppliers and service providers, including their secure development procedures”. In our reading, an inverter vendor that pushes firmware and holds a live connection to your fleet is a direct supplier in the plainest sense. Our supply chain security guide covers the general method.

The SEEG report turns this into concrete controls for utility-scale plants, which it defines as above 1 MW. Inverter traffic should be documented, encrypted and authenticated. Outbound connections should go only to whitelisted servers in the EU or under equivalent jurisdictions. No inbound communication should come from outside the local network. For commercial, industrial and utility-scale installations, manufacturer-triggered automatic firmware updates should be replaced by controlled manual updates done by qualified maintenance providers. None of this is binding. It is still the most specific published benchmark we have found for what Article 21(2)(d) measures look like at a PV plant. Industry asked for the same direction earlier: the SolarPower Europe report written by DNV (April 2025) proposed that remote control of aggregated distributed devices “should only take place in regions judged equivalent in security to the EU”.

The aggregator point is easy to miss. A residential battery owner is far below the size cap, but the virtual power plant that dispatches thousands of those batteries is a market participant providing aggregation and, if it passes the size test, an NIS2 entity in its own right. Scope then sits where the remote control sits, not where the hardware sits. The same logic runs the other way for the EU’s limits. SEEG notes that NIS2 lets the Cooperation Group run coordinated supply chain risk assessments under Article 22, but “does not include direct mechanisms to take measures based on such a risk assessment”. Restricting a vendor is left to Member States.

Lithuania: a national law that caps remote access by state of origin

Plain-language summary: Lithuania has written the inverter problem into its electricity law. Above 100 kW, entities from states named as threats in its national security strategy must not be able to change your plant’s output or switch it on or off remotely.

The Seimas adopted the amendment on 12 November 2024, 79 votes to 1 with 6 abstentions, LRT reported. It inserted Article 73-3 into the Law on Electricity. In the consolidated text valid from 1 November 2026, the rule has four parts:

  • Paragraph 1 covers power plants, including hybrid plants, and energy storage facilities whose power-generating module has a maximum capacity above 100 kW. Their information and production control systems must be secured so that entities of states which, under the Seimas-approved National Security Strategy, threaten Lithuania’s national security have no access that would let them remotely change power parameters or switch the installation on or off. This paragraph was last amended in July 2026.
  • Under paragraph 2, network operators set the implementation conditions and a declaration form.
  • Under paragraph 3, the plant owner submits that declaration before the operator’s compliance check. If the check fails, the operator informs the National Energy Regulatory Council, which decides on suspending the permit to develop generation capacity.
  • Under paragraph 4, a failure found after the permits are issued can lead to a binding instruction from the regulator.

The law does not name a country. LRT reported that China is among the states the strategy identifies, that the Ministry counted more than 1,000 solar and wind parks above 100 kW, and that existing equipment does not have to be scrapped. pv magazine reported in June 2026 that existing sites had until 1 June 2026 to comply and that grid operators can now disconnect plants without the measures. Note the different thresholds. Lithuania’s rule starts at 100 kW of capacity, whatever the owner’s size, while NIS2 starts at medium-sized enterprises. A small Lithuanian SPV can be outside NIS2 and still bound by Article 73-3. For how Lithuania’s cybersecurity law and NKSC supervision fit together, see our Lithuania NIS2 guide.

What changes if the proposed 1 MW floor is adopted

Plain-language summary: the Commission has proposed taking producers of 1 MW or less out of NIS2. It is not law yet, and it only touches the producer row.

The annex to the Commission’s January 2026 proposal, COM(2026) 13, published as Council document 5627/26 ADD 1, would replace the producer indent with “Producers as defined in Article 2, point (38), of Directive (EU) 2019/944 … excluding producers whose total generation capacity does not exceed 1 MW”. The aggregation, demand response and storage row is not changed in that annex. A storage operator trading in balancing markets would therefore stay covered whatever its capacity, if it passes the size test. As of November 2026 the Legislative Observatory lists procedure 2026/0012(COD) as “Awaiting committee decision”, with an indicative plenary date of 8 March 2027. Plan on today’s text. For the other proposed changes, see our overview of the NIS2 review.

Role-by-role actions

Plain-language summary: each role starts somewhere different. The owner structure decides scope, and the access map decides most of the security work.

Role First action Effort
Board / C-suite Approve a group-level scope decision for every SPV, with the linked-enterprise calculation attached Low
Compliance officer / legal Map each SPV to its Annex I rows and Member State, and check whether your authority accepts the Recital 16 independence argument Medium
CISO / OT security lead List every party with remote access to inverters, controllers and batteries, then compare connections against the SEEG controls: outbound whitelisting, no inbound, manual firmware updates High
SME owner of a single plant Calculate your size with your owners’ figures before deciding you are out, and check national rules such as Lithuania’s 100 kW cap Low

Frequently asked questions

Is every solar park or wind farm covered by NIS2?

No. A producer is covered if the company is at least medium-sized after adding linked and partner enterprises, or if a size-independent rule applies, such as Article 2(2)(b) to (e) or Article 2(3) for critical entities. A standalone small SPV is normally outside NIS2, though national rules may still apply.

Does a factory with rooftop solar count as an electricity producer?

It can. The producer definition in Directive 2019/944 does not exclude final customers, and the Belgian regulator, as reported by Eversheds Sutherland, treats self-consumption producers as in scope if they pass the size test. Check your national authority’s guidance.

Is a battery storage operator in NIS2 scope?

A storage operator that provides energy storage services in an electricity market falls under the market participant row of Annex I, subject to the size test. A battery used only behind the meter is a different case, and in our reading it falls outside that row.

Does NIS2 ban Chinese inverters?

No. NIS2 requires you to assess supplier risk under Article 21(2)(d) and 21(3), and it leaves restrictions to Member States. Lithuania has one: Article 73-3 of its Law on Electricity bars remote control access for entities of states its security strategy names as threats, above 100 kW.

This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.

Sources

  1. European Parliament and Council. Directive (EU) 2022/2555 (NIS2 Directive), Articles 3, 6(39), 21, 22 and 34, Recital 16 and Annex I. Official Journal L 333, 27.12.2022.
  2. NIS 2 Directive, Article 2: Scope. Article-level text, nis-2-directive.com.
  3. European Parliament and Council. Directive (EU) 2019/944 on common rules for the internal market for electricity, Article 2. Official Journal L 158, 14.6.2019.
  4. European Parliament and Council. Regulation (EU) 2019/943 on the internal market for electricity, Article 2(25). Official Journal L 158, 14.6.2019.
  5. European Commission. Recommendation 2003/361/EC concerning the definition of micro, small and medium-sized enterprises, Annex Articles 2, 3, 4 and 6. Official Journal L 124, 20.5.2003.
  6. Council of the European Union. Document 5627/26 ADD 1, Annex to the proposal for a Directive amending Directive (EU) 2022/2555, COM(2026) 13.
  7. European Parliament. Legislative Observatory, procedure file 2026/0012(COD).
  8. Smart Energy Expert Group, Working Group on Cybersecurity. Recommendations to address cybersecurity risk in photovoltaic generation, version 1.1, 1 October 2026.
  9. Republic of Lithuania. Law on Electricity No VIII-1881, Article 73-3, consolidated version valid from 1 November 2026. Kodeksai.lt.
  10. LRT. Lithuania passes law to block Chinese access to solar and wind farm systems, 12 November 2024.
  11. pv magazine. Lithuania’s grid operators can now disconnect solar plants without cybersecurity measures, 5 June 2026.
  12. Eversheds Sutherland. NIS2 in Belgium: Are you considered an “energy producer” if you generate power solely for your own use?, 8 April 2025.
  13. SolarPower Europe and DNV. Solutions for PV Cyber Risks to Grid Stability, 29 April 2025.