A stack of glowing translucent sheets with two amber seals on the top sheet and a light thread rising to a shield, representing a NIS2 risk assessment report and its management approval

Risk Assessment Report Template for NIS2: 11 Sections Mapped to CIR Annex 2.1, Including the 2 Acceptances It Must Record

In short

  • A NIS2 risk assessment report template has no official format: CIR 2024/2690 never uses the phrase “risk assessment report”; it asks for documented “risk assessment results”.
  • Point 2.1.1: management bodies, or accountable persons with adequate reporting to them, accept the results and the residual risks.
  • Point 2.1.4: review the results at least annually and after significant changes or incidents.
  • Checked against: CIR 2024/2690, NIS2 Article 20, ENISA guidance (June 2025).

The phrase “risk assessment report” does not appear anywhere in Commission Implementing Regulation (EU) 2024/2690. The regulation talks about “risk assessment results”, three times, and each mention gives those results a different job. In point 2.1.1 of the Annex, someone with authority has to accept them. In point 2.1.3 they feed the choice and ranking of treatment measures. In point 2.1.4 they get reviewed at least once a year and again after significant changes or incidents.

So the report is not a separate legal duty. It’s the document that carries your results through those three clauses. A good template is built around them, not around a generic “findings and recommendations” layout. Below are 11 sections, each tied to the clause it serves and to the question an auditor will ask about it. There is a worked executive summary and an approval record that covers both things point 2.1.1 says must be accepted.

Who is bound by what this report has to show?

How much of this is binding depends on which text applies to you. The CIR sets detailed rules only for the entity types in its Article 1. Everyone else in NIS2 scope gets the shorter duty in Article 21(2)(a) of the Directive, “policies on risk analysis and information system security”, as written into national law.

Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

Your entity What sets the content of the report How to read this guide
DNS service providers, TLD name registries, cloud computing, data centre and content delivery network providers, managed service providers, managed security service providers, online marketplaces, online search engines, social networking platforms, trust service providers CIR 2024/2690 Annex point 2.1 applies directly, alongside Articles 20 and 21 of the Directive as transposed nationally The 2.1 anchors in the template are legal requirements for you
Any other essential or important entity Your national law transposing Articles 20 and 21(2)(a) The CIR does not bind you. Its 2.1 structure is a sensible benchmark, and that is our reading, not a rule. Check your national authority’s guidance first
Not in NIS2 scope Nothing in NIS2 Useful practice if a customer contract or ISO/IEC 27001 asks for a documented risk assessment

For the full split between the Directive and the CIR, see our guide to NIS2 risk management requirements under Article 21(2)(a).

The three jobs CIR point 2.1 gives your results

Most templates on the market follow a security-assessment layout: scope, method, findings, recommendations. That covers the content side of point 2.1. It misses the side that is about decisions and time: who accepted the results, what the treatment plan took from them, and how this year’s results compare with last year’s.

Clause What the text says Job for the report Where reports usually fail
2.1.1 “Risk assessment results and residual risks shall be accepted by management bodies or, where applicable, by persons who are accountable and have the authority to manage risks, provided that the relevant entities ensure adequate reporting to the management bodies.” Be acceptable: a summary a decision-maker can read in one sitting, and a record of who accepted what The board receives a spreadsheet export and nobody can show what it actually agreed to
2.1.3 Treatment options and measures are identified and prioritised taking into account “the risk assessment results”, effectiveness results, cost against expected benefit, the asset classification (point 12.1) and the business impact analysis (point 4.1.3) Feed the treatment plan: ratings that point to the asset class and impact analysis they used Ratings sit in one file, the impact analysis in another, and nothing links them
2.1.4 Review and, where appropriate, update the results and the treatment plan “at planned intervals and at least annually, and when significant changes to operations or risks or significant incidents occur” Be comparable over time: dated, versioned, with the reason for this cycle and the changes since the last one Last year’s file is overwritten, so no one can show what changed

Point 2.1.1 also keeps the results and the treatment plan apart. The entity must “perform and document risk assessments and, based on the results, establish, implement and monitor a risk treatment plan.” The plan comes after the results and is a separate document. Your report should summarise and point to the plan, not copy it. Our risk treatment plan guide covers what each treatment decision must record.

The template: 11 sections, each mapped to a clause and an auditor question

The structure below mixes two sources. The legal anchors come from CIR point 2.1. The reporting conventions come from Appendix K of NIST SP 800-30 Rev. 1, the US federal guide to risk assessments. Appendix K splits a report into an executive summary, a main body and appendices. NIST itself says these elements are “informative and exemplary only” and not meant to require a specific template, and the same goes here. Rename or merge sections, but keep the content.

# Section What it contains Anchor The auditor’s question
1 Document control and assessment cycle Assessment date, version, whether this is the annual review or a review triggered by an event (and which event), reference to the previous report, the period the results are valid for CIR 2.1.4; NIST App. K “Is this the current assessment, and what prompted it?”
2 Executive summary and decisions requested Overall risk level, number of risks at each level, risks above tolerance, and the two decisions you are asking for CIR 2.1.1; NIST App. K “What did the management body actually see before it signed?”
3 Scope and context Services, systems, sites and third parties in scope; exclusions with a reason; references to the asset classification and the business impact analysis CIR 2.1.2(d), 2.1.3 “What did you leave out, and why?”
4 Method, appetite and criteria applied Methodology name and version, the risk tolerance level and the appetite it comes from, the risk criteria and scales, any departure from the methodology this cycle CIR 2.1.2(a), (b), (c) “Can I trace each rating to a written criterion?”
5 Inputs used Threat intelligence, vulnerability data, incident and post-incident review findings, audit results, results of the effectiveness assessment CIR 2.1.2(e), 2.1.3 “Which threat and vulnerability data fed these ratings?”
6 Risk results The main risks with threat, vulnerability, impact, likelihood and risk level, and the evaluation against your criteria; non-cyber hazards; single points of failure; third-party risks CIR 2.1.2(d), (e), (f) “Show me the non-cyber hazards and your supplier risks.”
7 Changes since the previous report New, closed and re-rated risks, with the reason for each change CIR 2.1.4 “What changed after last spring’s incident?”
8 Treatment summary For each risk above tolerance: the option chosen, the measure, owner, target date and the matching line in the treatment plan CIR 2.1.1, 2.1.2(g), (i), 2.1.3 “Does every risk above tolerance have an owner and a date?”
9 Residual risk profile Expected residual level after treatment against tolerance; risks proposed for acceptance, with reasons; residual risks from third-party dependencies CIR 2.1.1, 2.1.2(j) “Who accepted this, against which criterion, and until when?”
10 Assumptions, limitations and uncertainty What the assessors assumed, what they could not test, and where the ratings are least certain NIST App. K (no CIR anchor) “What did you not know when you rated this?”
11 Approval record and distribution Both decisions, approver name and role, the authority they act under, date, conditions, next review date, who received the report CIR 2.1.1, 2.1.4; NIS2 Art. 20(1) “Show me the minute.”

Appendices: the register extract the report summarises, the methodology reference, the assessor team and the documents used.

Section 4: say what you actually used

The methodology document says how assessments should be run. Section 4 says how this one was run. If you changed a scale, skipped a business unit or brought in a new impact category this cycle, write it here. The ENISA Technical Implementation Guidance lists, as evidence, a methodology “and/or tools” that take into account at least elements (a) to (f) of point 2.1.2. That’s the method, the tolerance, the criteria, identification, analysis and evaluation, so the report should show all six were applied. State the tolerance as a test someone can apply. ENISA’s own examples of tolerance levels include “up to two hours of downtime per month” for highly critical systems and “up to EUR 100,000 in recovery costs”. If you still need to set yours, our guide on risk appetite and what the board can sign covers it.

Section 6: the all-hazards and supplier rows

Point 2.1.2(d) asks you to identify risks “in line with an all-hazards approach”, “in particular in relation to third parties”, “including the identification of single point of failures”. ENISA turns that into checks an assessor can run. Does the approach cover “natural or man-made, accidental or intentional” threats, not just cyber ones? Is there “evidence that residual risks resulting from dependencies on third parties are listed and mitigated”? A results table with only malware, phishing and patching rows fails the first check at a glance. Give power, premises, key people and the two or three suppliers you can’t easily replace their own rows. ENISA’s evidence list also wants a “list of the main risks described at a high level, including underlying threat(s) and unaddressed vulnerabilities and their potential impact”. That high-level list is what section 6 should open with, before the full register extract.

Section 7: the part almost every template leaves out

Point 2.1.4 makes the review cyclical, and ENISA lists “review comments or change logs for the risk assessment and risk treatment plan” as evidence. A changes section is the cheapest way to produce that evidence. ENISA also lists what the annual review should take into account. That list makes a good checklist for this section:

  • results of audits and previous reviews;
  • the status of the measures in the treatment plan;
  • changes to the information systems;
  • changes to the environment of operation;
  • post-incident review findings;
  • trends and changes in threats and vulnerabilities.

At least annually CIR point 2.1.4 sets the minimum review cycle for the risk assessment results and the risk treatment plan, with extra reviews after significant changes or significant incidents.

Source: Commission Implementing Regulation (EU) 2024/2690, Annex point 2.1.4

Two acceptances, one approval page

Point 2.1.1 names two things to be accepted: the “risk assessment results” and the “residual risks”. The ENISA guidance keeps them apart in its evidence list. It names a “record of approval of risk assessment results” and, separately, a “record of approval of residual risks”. The simplest way to produce both is one approval page with two decision lines. Approving residual risks alone leaves the results unaccepted. Approving the results alone leaves the risks you chose to live with undecided.

The clause also says who may accept: the management body “or, where applicable”, persons “who are accountable and have the authority to manage risks”, but only “provided that” the entity ensures “adequate reporting to the management bodies”. So delegation is allowed, but it comes with a condition. If a risk committee or the CISO signs, the approval record should name the authority they act under, such as a board resolution or a delegation in the risk management policy. It should also show when and how the result was reported upward. Ireland’s National Cyber Security Centre puts the same idea in its draft risk management measures guidance (June 2025). There, residual risks are “either treated or risk accepted by risk owners, with adequate reporting to the management board”. This is one national authority’s draft, not an EU-wide rule, so check what your own authority has published.

The Directive adds the governance layer. Article 20(1) of the NIS2 Directive requires Member States to ensure that management bodies “approve the cybersecurity risk-management measures” taken to comply with Article 21, “oversee its implementation” and “can be held liable” for infringements. Article 20 does not mention a risk assessment report. In practice, though, the report and the treatment plan it summarises are what show the board what it approved and what it is overseeing. Article 20(2) requires members of management bodies to follow training so they can “identify risks and assess cybersecurity risk-management practices”. A 300-row register works against that. A two-page summary works for it. Our guide to Article 20 board governance obligations covers the evidence regulators accept for the approval itself.

A minimal approval record, as the last section of the report:

Field Example entry
Decision 1 The management body accepts the risk assessment results in sections 6 and 7 of report v2026.2
Decision 2 The management body accepts the residual risks R-07, R-19 and R-31 listed in section 9, on the conditions stated there
Approver and authority Board of directors, meeting of [date], minute item [n]; or, if delegated: [role], acting under [resolution or policy clause], with reporting to the board on [date]
Conditions Each accepted risk returns for decision by its review date, or earlier if its rating rises
Next scheduled review [Date] within the annual cycle of point 2.1.4, or earlier after a significant change or incident
Distribution Risk owners, IT lead, compliance officer, internal audit

The distribution line is more than a courtesy. ENISA counts “key personnel knowing the main risks” as evidence, and gives emails, interviews and awareness sessions as examples. A later item in the same guidance lists the risk register itself as evidence. How to write each acceptance (who accepted it, against which criterion, until when) is covered in our residual risk documentation guide. In the report, list the accepted risks and point to the acceptance records rather than repeating them.

What auditors and supervisors look for first

The report may matter more in a supervisory audit than many teams expect. Under Articles 32(2) and 33(2) of the Directive, competent authorities can subject essential and important entities to targeted security audits. Those audits “shall be based on risk assessments conducted by the competent authority or the audited entity, or on other risk-related available information” (Article 32, Article 33). Your own assessment is one of the inputs the law names for scoping such an audit.

Read against point 2.1, these are the gaps that follow most directly from the text, with the fix for each:

What the auditor finds Why it is a problem Fix in the template Effort
The register export is the “report” There is no summary to show what the accepting body saw (2.1.1) Section 2, two pages at most Low
Only residual risks were signed 2.1.1 names the results and the residual risks; ENISA lists two approval records Two decision lines in section 11 Low
A manager signed, with no trail to the board Delegated acceptance depends on “adequate reporting to the management bodies” Authority and reporting date in section 11 Low
Last year’s report was overwritten 2.1.4 review cannot be shown; ENISA lists “documented results from previous risk assessments” Versioning in section 1, changes in section 7 Low
Only cyber threats are listed 2.1.2(d) requires an all-hazards approach Non-cyber and supplier rows in section 6 Medium
Ratings cannot be traced to criteria 2.1.2(f) evaluates “based on the risk criteria” Criteria and departures in section 4 Medium
Accepted risks have no end date 2.1.2(j) wants reasons “in a comprehensible manner”; the plan is reviewed under 2.1.4 Review date per risk in section 9 Low

If your scoring grid is the weak point, our risk matrix guide covers where a 5×5 grid helps and where it misleads.

Worked example: the executive summary of a managed service provider

The company below is made up, and the numbers only show the format. A managed service provider is one of the CIR’s Article 1 entity types, so point 2.1 applies to it directly. Its section 2 might read like this:

Cycle: annual review 2026, brought forward by six weeks after a significant incident at our remote-monitoring tool supplier (see section 7). Previous report: v2025.1.

Overall picture: 46 risks assessed: 2 very high, 5 high, 17 medium, 22 low. Seven risks are above the tolerance level set in the methodology (no risk rated high or above is carried without treatment).

What changed: 4 new risks, 3 closed, 6 re-rated. The supplier incident raised “compromise of the remote-monitoring platform” from medium to very high and added a single point of failure: one platform administrator account per customer tenant.

Treatment: the seven risks above tolerance each have an owner and a target date in treatment plan v2026.2. Four are due before the end of Q1.

Decisions requested: (1) accept the results in sections 6 and 7; (2) accept three residual risks (R-07, R-19, R-31) until the review dates in section 9.

That’s about 150 words, and every sentence answers a question from the table above. The supplier incident shows 2.1.4 at work: it brought the review forward, section 7 records why, and the board sees the new single point of failure in the summary rather than on row 212 of the register.

For the slides that carry this summary into the boardroom, see our NIS2 board presentation template.

Who does what with the report

Role Responsibility What to check before it goes up
Risk manager or CISO Runs the assessment, writes sections 1 to 10 Every rating traces to a criterion; changes since last cycle are explained
Risk owners Confirm ratings and treatment for their risks Owner and date for every risk above tolerance
Compliance officer Checks the report against point 2.1 (or national rules) and files the evidence Both decisions recorded; previous versions retained; review date set
Management body Accepts results and residual risks, or delegates with reporting Can it explain the top risks and why the accepted ones are acceptable?
Internal audit or independent reviewer Tests the process under point 2.3 Whether decisions match the risk acceptance criteria (2.3.3)

If you are an SME owner without a risk team: the same 11 sections work at five pages. Merge sections 3 to 5 into one “how we did it” page. Keep sections 1, 2, 7 and 11 as they are: they carry the date, the summary, the changes and the decisions that points 2.1.1 and 2.1.4 turn on.

If you are a CISO in a group: write one report per legal entity in scope, or one group report with an entity-level section 2 and section 11. Point 2.1.1 applies to each relevant entity, so each one needs a record of its own results being accepted.

If you sit on the board: before you sign, ask which risks are above tolerance, what changed since last year, and who signed the residual risks if you didn’t. If the report cannot answer those three questions, it is not ready for approval.

Frequently asked questions

Is there an official NIS2 risk assessment report template?

No. Neither the NIS2 Directive nor CIR 2024/2690 prescribes a format, and the CIR never uses the term “risk assessment report”. It requires documented risk assessments and results that are accepted, used for treatment and reviewed. ENISA lists evidence types, not a template.

Who has to sign the risk assessment report?

Under CIR point 2.1.1, the results and the residual risks must be accepted by the management bodies or, where applicable, by accountable persons with authority to manage risks, provided there is adequate reporting to the management bodies. Article 20(1) of the Directive separately requires management bodies to approve the risk-management measures.

How often must the report be updated?

CIR point 2.1.4 requires review of the results and the treatment plan at planned intervals, at least annually, and when significant changes to operations or risks or significant incidents occur. Entities outside the CIR should check their national law.

Is a risk register enough?

The CIR does not name either document, but a register alone rarely shows what was accepted, by whom, or what changed since the last review. ENISA lists the register as one item of evidence and the approval records as separate items.

We are not a CIR entity. Should we still use this structure?

Article 21(2)(a) still requires policies on risk analysis, under your national law. The CIR’s 2.1 structure is a reasonable benchmark, but it is not binding on you. Check your national authority’s guidance first. For the wider assessment process, see our NIS2 risk assessment guide for SMEs.

Next step

Take your last risk assessment and check it against sections 1, 2, 7 and 11 of the table above. If the date, the summary, the changes or the two decisions are missing, add those four before reworking the method. They are low-effort fixes, and they are the gaps most directly visible against points 2.1.1 and 2.1.4. Then put the next review in the calendar. Point 2.1.4 requires one at least annually.

This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.

Sources

  1. European Commission. Commission Implementing Regulation (EU) 2024/2690 of 17 October 2024 (technical and methodological requirements of cybersecurity risk-management measures). EUR-Lex
  2. European Parliament and Council. Directive (EU) 2022/2555 (NIS2 Directive). EUR-Lex
  3. NIS2 Directive, Article 20: Governance (OJ text)
  4. NIS2 Directive, Article 21: Cybersecurity risk-management measures (OJ text)
  5. NIS2 Directive, Article 32: Supervisory and enforcement measures in relation to essential entities (OJ text)
  6. NIS2 Directive, Article 33: Supervisory and enforcement measures in relation to important entities (OJ text)
  7. ENISA. Technical Implementation Guidance on Commission Implementing Regulation (EU) 2024/2690, version 1.0, June 2025
  8. NIST. Special Publication 800-30 Revision 1, Guide for Conducting Risk Assessments, Appendix K, September 2012
  9. National Cyber Security Centre (Ireland). NIS2 Draft Risk Management Measures Guidance, draft of 4 June 2025