In short
- The DORA ICT risk management framework is the “sound, comprehensive and well-documented” set of strategies, policies, procedures, ICT protocols and tools that Article 6 requires as part of a financial entity’s overall risk management system.
- It needs an eight-point digital operational resilience strategy (Art. 6(8)), a control function with an appropriate level of independence (Art. 6(4)) and internal audit (Art. 6(6)), and a review at least once a year (Art. 6(5)).
- RTS (EU) 2024/1774 Article 27 sets 12 required parts for the review report, submitted on request in a searchable electronic format.
- Checked against: Regulation (EU) 2022/2554, Delegated Regulation (EU) 2024/1774 and its corrigenda.
Article 6 of DORA is ten paragraphs long, and almost every one of them ends in something a supervisor can ask to see in writing. The framework itself has to be “documented” (Art. 6(5)). The strategy must set out eight specific elements (Art. 6(8)). The control function must be independent enough “to avoid conflicts of interest” (Art. 6(4)). Internal audit runs “in line with the financial entities’ audit plan” (Art. 6(6)). And the yearly review produces a report that the competent authority can request (Art. 6(5)). Delegated Regulation (EU) 2024/1774 then adds the general elements every ICT security policy must carry (Art. 2), what the ICT risk management policy must contain (Art. 3), and the 12 parts of the review report (Art. 27).
This guide follows that order: who has to build the full framework, Article 6 paragraph by paragraph, the strategy, RTS Articles 1 to 3, the control function and internal audit, the review and its report, and what microenterprises may leave out. CISOs can go straight to the Article 2(2) checklist and the role table. Compliance officers will want the Article 27 report section. Board members should read the strategy section, because Regulation (EU) 2022/2554 makes the management body responsible for approving it (Art. 5(2)(d)). For the wider picture, start with our guide to DORA compliance.
Who must build a full Article 6 framework?
In plain terms: every financial entity in DORA’s scope builds an Article 6 framework unless it is one of the five types that Article 16(1) moves to the simplified regime. Microenterprises build the full framework too, with three reliefs written into Article 6 itself and one in Article 5(3). DORA has applied since 17 January 2025 (Art. 64), and RTS 2024/1774 took effect on 15 July 2024.
Get the NIS2 Article 21 Compliance Checklist
90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.
| Your entity | Which framework | What changes | Basis |
|---|---|---|---|
| Any financial entity in Article 2(1) that is neither a microenterprise nor an Article 16(1) entity | Full framework: Articles 5 to 15 and RTS 2024/1774 Title II | Nothing lifted | DORA Arts 5-15; RTS Art. 1 (Title I) and Arts 2-27 (Title II) |
| Microenterprise: fewer than 10 persons and annual turnover and/or balance sheet total not above EUR 2 million (not a trading venue, CCP, trade repository or CSD) | Full framework, with reliefs | No control function, periodic rather than yearly review, no mandatory internal audit | DORA Arts 3(60), 6(4), 6(5), 6(6) |
| Small and non-interconnected investment firms, exempted payment and e-money institutions, CRD-exempted institutions where the Member State did not use Article 2(4), small IORPs | Simplified framework | Articles 5 to 15 “shall not apply” | DORA Art. 16(1); RTS Title III |
The practical takeaway: size alone never moves you to the simplified regime. A ten-person payment institution that is not exempted under PSD2 builds the full framework. If you are in the third row, our guide to the Article 16 simplified ICT risk framework gives the qualifying tests. The sections below do not apply to you directly, because Article 16 and Title III replace them.
Article 6 paragraph by paragraph: what must exist in writing
In plain terms: Article 6 asks for one framework, one strategy, one independent control function, an audit trail and a yearly review. The table maps each paragraph to the record a supervisor would ask for. The “written record” column is our reading of what evidences each duty, not wording from the Regulation.
| Paragraph | What it requires | Written record that evidences it | Microenterprise |
|---|---|---|---|
| 6(1) | A “sound, comprehensive and well-documented” framework, part of the overall risk management system | Framework document linked to the enterprise risk framework | Applies |
| 6(2) | At least strategies, policies, procedures, ICT protocols and tools to protect all information assets, ICT assets and relevant physical infrastructure | Document map listing each component | Applies |
| 6(3) | Minimise the impact of ICT risk; give the competent authority “complete and updated information” on request | Current versions, ready to hand over | Applies |
| 6(4) | A control function with “an appropriate level of independence”; segregation per the three lines of defence or another internal risk management and control model | Role descriptions, reporting lines, segregation rules | Control function lifted; segregation sentence has no carve-out |
| 6(5) | Documented framework, reviewed at least once a year and after three kinds of event; continuous improvement; report on request | Review record and the Article 27 report | “Periodically” instead of yearly |
| 6(6) | Internal audit “on a regular basis” by auditors with ICT knowledge and independence; frequency and focus “commensurate to the ICT risk” | ICT audit plan and audit reports | Lifted |
| 6(7) | A formal follow-up process, “including rules for the timely verification and remediation of critical ICT audit findings” | Findings tracker with deadlines | No carve-out of its own; it applies wherever internal audit produces conclusions |
| 6(8) | A digital operational resilience strategy with elements (a) to (h) | Strategy approved by the management body | Applies |
| 6(9) | Option (“may”) to define a holistic ICT multi-vendor strategy | Optional section of the strategy | Optional |
| 6(10) | Option to outsource the verification of compliance; the entity “remains fully responsible” | Contract and oversight record if used | Optional |
Two paragraphs are optional and eight are binding. The one most often misread is 6(4): its first sentence spares microenterprises the control function, but its second sentence (“Financial entities shall ensure appropriate segregation and independence of ICT risk management functions, control functions, and internal audit functions”) is addressed to all financial entities. In our reading, a five-person firm should still be able to show how it separates running ICT from checking it, to the extent its internal model allows.
The digital operational resilience strategy: the eight elements of Article 6(8)
In plain terms: the strategy is the part of the framework that says how the framework “shall be implemented” (Art. 6(8)), and the management body bears “the overall responsibility for setting and approving” it, including the ICT risk tolerance level (Art. 5(2)(d)). It is not a general IT strategy. BaFin’s DORA guidance notes that the DORA strategy “focuses on ICT risk management”, while the IT strategy in its old BAIT/VAIT rules was “considerably broader”, so “the two strategies cannot be equated”.
| Point | The strategy must | What a reviewer will test |
|---|---|---|
| (a) | Explain how the framework supports the business strategy and objectives | A named link from each business objective to ICT risk measures |
| (b) | Establish the risk tolerance level for ICT risk, in line with the risk appetite, and analyse the impact tolerance for ICT disruptions | A tolerance the management body approved, and impact tolerances per function |
| (c) | Set clear information security objectives, including key performance indicators and key risk metrics | Measurable objectives that the ICT security policies align to (RTS Art. 2(2)(a)) |
| (d) | Explain the ICT reference architecture and the changes needed to reach business objectives | A current architecture and a target |
| (e) | Outline the mechanisms to detect ICT-related incidents, prevent their impact and protect from it | Detection and protection measures named, not just referenced |
| (f) | Evidence the current resilience situation by the number of major ICT-related incidents reported and the effectiveness of preventive measures | Actual incident counts and control results |
| (g) | Implement digital operational resilience testing under Chapter IV | The testing programme and its cycle |
| (h) | Outline a communication strategy for ICT-related incidents whose disclosure Article 14 requires | Who speaks, to whom, when |
Point (b) is the hinge of the whole framework, and the RTS makes that concrete. The ICT risk management policy must record “an indication of the approval” of that tolerance level (RTS Art. 3(a)). Treatment measures must bring ICT risk “within the risk tolerance level” (Art. 3(c)). Any residual risk above it needs a named role to accept it, an inventory with “a justification for their acceptance”, and a review “at least once a year” (Art. 3(d)). A tolerance written as “low” with no scale breaks that chain, because no risk can be shown to sit inside or outside it. Point (f) is the other trap: it asks for numbers, so a strategy written before your first incident count exists will need updating at the first review.
Article 6(9) adds an option, not a duty: entities “may” define a holistic ICT multi-vendor strategy showing key dependencies on ICT third-party service providers. The duty to have a strategy on ICT third-party risk sits in Article 28(2), covered in our guide to the DORA ICT third-party risk policy.
RTS 2024/1774 Articles 1 to 3: what the ICT security policies and the ICT risk management policy must contain
In plain terms: Article 1 tells you to scale everything to your size and risk profile, Article 2 lists what every ICT security policy must state, and Article 3 sets the contents of the ICT risk management policy and procedures. Article 1 names five elements that drive complexity: (a) encryption and cryptography, (b) ICT operations security, (c) network security, (d) ICT project and change management, and (e) the potential impact of ICT risk on confidentiality, integrity and availability of data and on the continuity of activities.
Article 2(1) requires the ICT security policies to be “embedded in” the framework and to (a) ensure the security of networks, (b) contain safeguards against intrusions and data misuse, (c) preserve the availability, authenticity, integrity and confidentiality of data, and (d) guarantee “an accurate and prompt data transmission without major disruptions and undue delays”. Article 2(2) then gives 11 elements that every one of those policies must meet. That makes it the most useful document-review checklist in the RTS.
| Art. 2(2) | Every ICT security policy must | Quick check on your draft |
|---|---|---|
| (a) | Align to the information security objectives in the Article 6(8) strategy | Does it cite a strategy objective? |
| (b) | Indicate the date of formal approval by the management body | Approval date on the cover |
| (c) | Contain indicators and measures to monitor implementation, record exceptions, and keep resilience ensured in case of exceptions | KPIs plus an exceptions register |
| (d) | Specify the responsibilities of staff at all levels | Roles section or RACI |
| (e) | Specify the consequences of staff non-compliance, unless another policy already does | Sanctions clause or cross-reference |
| (f) | List the documentation to be maintained | Records list |
| (g) | Specify segregation of duties in the three lines of defence model or other internal model | Segregation rule named |
| (h) | Consider leading practices and, where applicable, standards under Regulation (EU) No 1025/2012 | Standards referenced |
| (i) | Identify roles for developing, implementing and maintaining the policy | Owner and maintainer named |
| (j) | Be reviewed in accordance with Article 6(5) of DORA | Review cycle stated |
| (k) | Take into account material changes to activities, processes, the cyber threat landscape or legal obligations | Change triggers stated |
Run this table against each policy before the management body approves it. On a policy set inherited from another framework, check points (b), (c) and (j) first: DORA wants the management body’s approval date, a record of exceptions, and a review cycle tied to Article 6(5).
Article 3 adds six required contents for the ICT risk management policies and procedures: (a) the approval of the risk tolerance level, (b) a risk assessment procedure and methodology identifying vulnerabilities and threats and “the quantitative or qualitative indicators” to measure impact and likelihood, (c) the treatment procedure, (d) the residual-risk rules described above, (e) monitoring of changes in the ICT risk and cyber threat landscape, of vulnerabilities and threats, and of the entity’s own ICT risk profile, and (f) a process to take changes in the business strategy and the resilience strategy into account. The treatment procedure must also monitor the effectiveness of the measures, assess “whether the established risk tolerance levels … have been attained”, and check that corrections were made where necessary.
Control function, three lines of defence and internal audit
In plain terms: the second line (the control function) oversees ICT risk, the third line (internal audit) audits the framework, and the management body approves the audit plans. DORA does not say who the control function must be. The Austrian FMA’s DORA FAQ answers the common question directly: “The ICT risk control function may also be performed by the CISO, provided that there is an appropriate level of independence pursuant to Article 6 (4) DORA”, with the structure assessed case by case. BaFin compares the new control function to the information security officer of its old rules, which it “closely resembles” but is “not identical to”; if the ISO takes on the role, BaFin says entities “should ensure that the ISO likewise assumes the ICT risk management tasks”.
| Role | Owns | DORA basis | Typical holder (practice, not law) |
|---|---|---|---|
| Management body | Ultimate responsibility for ICT risk; approves the strategy and risk tolerance; approves and periodically reviews ICT internal audit plans, ICT audits and material modifications; allocates budget; keeps ICT knowledge current | Art. 5(2)(a), (d), (f), (g); Art. 5(4) | Board or management board |
| ICT risk management (first line) | Must be segregated from the control and internal audit functions; in practice it runs the controls day to day | Art. 6(4), second sentence | CIO, IT operations |
| Control function (second line) | “Responsibility for managing and overseeing ICT risk”, with an appropriate level of independence | Art. 6(4), first sentence | CISO or ICT risk officer, outside the IT delivery line |
| Internal audit (third line) | Audits the framework “on a regular basis” with ICT knowledge and independence; findings feed a formal follow-up process | Art. 6(6), 6(7) | Internal audit, in-house or sourced |
Two details catch people out. First, audit frequency is not fixed: Article 6(6) makes “the frequency and focus of ICT audits … commensurate to the ICT risk”, so the audit plan has to justify its cycle against the risk assessment. Second, Article 6(7) wants “rules for the timely verification and remediation of critical ICT audit findings”. A findings list without deadlines and a verification step does not meet that. If you outsource “the tasks of verifying compliance with ICT risk management requirements”, Article 6(10) allows it “in accordance with Union and national sectoral law”, but “the financial entity remains fully responsible for the verification of compliance”.
The yearly review: one annual cycle, three event triggers
In plain terms: you review the framework at least once a year (microenterprises: periodically) and also whenever one of three events happens. Article 6(5) lists them: “upon the occurrence of major ICT-related incidents”, “following supervisory instructions”, or following “conclusions derived from relevant digital operational resilience testing or audit processes”. The framework must also be “continuously improved on the basis of lessons derived from implementation and monitoring”.
The review cycle runs through the RTS as well. Every ICT security policy must be “reviewed in accordance with Article 6(5)” (RTS Art. 2(2)(j)), and accepted residual risks are reviewed “at least once a year” (Art. 3(d)(iv)). In practice the simplest design is one annual review window. In that window the policies, the risk register and the accepted risks are reviewed together, and an event-driven review is opened only for the trigger and the components it touches. The review then becomes the input to the report described next. The major-incident trigger depends on your classification, covered in our guide to DORA major incident classification.
The review report under RTS Article 27: 12 required parts
In plain terms: DORA says the report “shall be submitted to the competent authority upon its request” (Art. 6(5)), and RTS Article 27 says what it contains and that it comes “in a searchable electronic format” (Art. 27(1)). A text-based PDF or Word file meets that rule without argument; a scanned image of a signed report is hard to call searchable.
12 parts RTS (EU) 2024/1774 Article 27(2), points (a) to (l), lists the information every report on the review of the ICT risk management framework must include.
Source: European Commission, Delegated Regulation (EU) 2024/1774 (EUR-Lex document page)
| Art. 27(2) | Required content |
|---|---|
| (a) | Introduction: the entity and its group structure; the context (nature, scale and complexity, critical functions, strategy, major projects, dependence on in-house and contracted ICT); major framework changes since the previous report; an executive summary of the current and near-term ICT risk profile, threat landscape, control effectiveness and security posture |
| (b) | The date the management body approved the report |
| (c) | The reason for the review under Article 6(5) |
| (d) | Start and end dates of the review period |
| (e) | The function responsible for the review |
| (f) | Major changes and improvements since the previous review |
| (g) | Findings, with detailed analysis and assessment of the severity of weaknesses, deficiencies and gaps |
| (h) | Measures: remediation taken; expected dates and progress, flagging any risk to deadlines; tools and responsible function, internal or external; impact on budget, people and material resources; the process for informing the competent authority, where appropriate; for gaps not corrected, the criteria used to evaluate and accept the residual risk |
| (i) | Planned further developments of the framework |
| (j) | Conclusions of the review |
| (k) | Past reviews: a list to date, the state of corrective measures from the last report, and how ineffective measures could be improved |
| (l) | Sources: internal audit results (other than microenterprises), compliance assessments, resilience testing and, where applicable, TLPT results, and external sources |
Two follow-on sentences in Article 27(2) add content that depends on why you reviewed. Where the review followed supervisory instructions, testing or audit conclusions, the report “shall contain explicit references to such instructions or conclusions”. Where it followed ICT-related incidents, “the report shall contain the list of all ICT-related incidents with incident root-cause analysis”. The wording leaves a question open. Article 6(5) triggers the review on major incidents, and Article 27 asks for “all ICT-related incidents”. The parallel rule for simplified entities, RTS Article 41(2)(c)(ii), reads “the list of all those ICT-related incidents”, meaning the incidents that started the review. On the narrow reading you list the triggering incidents. On the wide reading you list every ICT-related incident in the period, which only works if your incident log holds a root-cause field for minor incidents too. Our own review-report template lists the incidents that started the review and, as a precaution for the wide reading, the other major incidents of the period. Until your competent authority says otherwise, the safer course is to record a root cause for every incident you log. A third sentence requires point (f) to analyse the impact of the changes on the strategy, the ICT internal control framework and ICT risk management governance.
How often will you be asked? DORA sets no fixed submission cycle. The RTS recital 25 describes the duty as reviewing the framework and providing the authority “with a report on that review”, but recitals do not bind, and the operative text in Article 6(5) says “upon its request”. The FMA states that “there is currently no planned regular submission” and that a requested report is to be submitted “in a timely manner”. BaFin writes that the supervisory authority “may require a review and request a report on the review”. Other authorities may set their own practice, so check your competent authority’s guidance. When it reviews your report, the competent authority must “consider the application of the proportionality principle” (DORA Art. 4(3)), so Article 27(2)(a)(ii), the context section, is where you explain why your framework is the size it is.
What microenterprises may leave out, and what they may not
In plain terms: a microenterprise under Article 3(60) builds the same framework with lighter governance, but the strategy, the policies and the RTS Title II contents still apply. DORA recital 43 describes the intent: microenterprises “should not be required” to assign ICT risk to a control function, to document and review the framework at least once a year, or to subject it to internal audit on a regular basis. Recitals do not bind, so the reliefs below are the ones the operative articles actually grant.
| Requirement | Microenterprise position | Basis |
|---|---|---|
| Control function with independence | Not required | Art. 6(4), first sentence |
| Segregation of ICT risk management, control and internal audit functions | Still addressed to all financial entities | Art. 6(4), second sentence |
| Review of the framework | “Periodically”, plus the incident, supervisory and testing or audit triggers | Art. 6(5) |
| Internal audit of the framework | Not required | Art. 6(6) |
| Role to monitor ICT third-party arrangements | Not required | Art. 5(3) |
| Strategy, policies, RTS Arts 1-3, review report on request | Apply; the report omits internal audit results | Arts 6(1)-(3), 6(8); RTS Art. 27(2)(l)(i) |
One wording point: Article 6(5) says the framework “shall be documented and reviewed at least once a year, or periodically in the case of microenterprises”. The relief attaches to the review interval. Nothing in the operative text lifts the duty to document the framework. A microenterprise that skips the written framework because recital 43 mentions documentation is relying on a recital against an article.
A build order that follows the law’s own dependencies
In plain terms: build the pieces in the order they depend on each other, because each later document cites an earlier one. The effort ratings are our estimate for a small or mid-sized entity, not a legal requirement.
- Record scope and proportionality (Low): Article 2(1) category, microenterprise test, Article 16(1) status. Everything else depends on it.
- Management body roles and risk tolerance (Medium): Article 5(2) duties, approval routes, and a tolerance on a scale you can measure against.
- The Article 6(8) strategy (High): the eight elements, approved by the management body.
- Framework document and document map (Medium): Article 6(1)-(2), one register of every policy, procedure and tool.
- Policies checked against RTS Article 2(2) (High): run the 11-point table on each one.
- Risk methodology and register (High): RTS Article 3 (a)-(f), including the accepted-risk inventory.
- Control function and three lines (Medium): Article 6(4) roles, reporting lines, segregation.
- ICT audit plan approved, follow-up process live (Medium): Articles 5(2)(f), 6(6), 6(7).
- Dry-run the Article 27 report (Medium): fill all 12 parts once, before anyone asks.
For how these requirements compare with the NIS2 risk-management measures, see DORA vs NIS2. For the regulation as a whole, start with what is DORA.
Frequently asked questions
What is the DORA ICT risk management framework?
It is the “sound, comprehensive and well-documented” framework of strategies, policies, procedures, ICT protocols and tools that Article 6(1) and (2) of DORA require, as part of the financial entity’s overall risk management system.
How often must the ICT risk management framework be reviewed under DORA?
At least once a year, or periodically for microenterprises, and also after major ICT-related incidents, supervisory instructions, or conclusions from resilience testing or audits (Art. 6(5)).
Do we have to send the review report to the regulator every year?
DORA requires submission “upon its request” (Art. 6(5)). The Austrian FMA says there is currently no planned regular submission. Check your own competent authority’s practice.
Can the CISO be the DORA control function?
DORA does not name the holder; it requires an appropriate level of independence (Art. 6(4)). The FMA says the CISO may perform it if that independence exists, assessed case by case.
What format must the review report have?
A searchable electronic format (RTS 2024/1774 Art. 27(1)), approved by the management body, with the 12 parts of Article 27(2).
Has RTS 2024/1774 been corrected?
Yes, twice: corrigendum R(01) concerns the Croatian version, and R(02) of 15 May 2025 corrects the English Article 22(d) cross-reference to Article 8(2) of Delegated Regulation (EU) 2024/1772. R(01) applies to the Croatian version only and R(02) changes only Article 22(d), so neither changes the English Articles 1 to 3 or 27; EUR-Lex lists no amending act.
This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.
Sources
- European Parliament and Council. Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Articles 3(60), 4, 5, 6, 16(1) and 64 and recital 43. Official Journal L 333, 27.12.2022. EUR-Lex
- EUR-Lex. Document information for Regulation (EU) 2022/2554: corrigenda R(01) to R(09), all for other language versions. EUR-Lex
- European Commission. Delegated Regulation (EU) 2024/1774, RTS specifying ICT risk management tools, methods, processes and policies and the simplified ICT risk management framework, Articles 1, 2, 3 and 27 and recital 25. Official Journal L, 2024/1774, 25.6.2024. EUR-Lex
- EUR-Lex. Document information for Delegated Regulation (EU) 2024/1774: date of effect 15.7.2024, corrected by R(01) and R(02). EUR-Lex
- European Commission. Corrigendum to Delegated Regulation (EU) 2024/1774, Official Journal L, 2025/90420, 15.5.2025. EUR-Lex
- Austrian Financial Market Authority (FMA). DORA – ICT Risk Management, including FAQ. FMA
- BaFin. Supervisory statement: Guidance notes on the implementation of DORA for ICT risk management and ICT third-party risk management (English translation, as of June 2024). BaFin
Get the NIS2 Article 21 Compliance Checklist
90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.