What is NIS2? Am I affected? Sectors Frameworks: NIS2 Frameworks: Cyber Resilience Act Frameworks: ISO 27001 Frameworks: DORA Frameworks: AI Act Pricing Free Guides Contact

DORA Compliance Pack

449,00 €

  • 42 editable files — 35 Word + 7 Excel: 36 templates + 6 guides for DORA Chapters II–V
  • Built from DORA and 8 RTS/ITS: 1,173 requirements mapped to a document and section
  • 16 open points in the law flagged, each with the pack’s default and where you decide
  • Excel tools for incident classification (RTS 2024/1772), report drafting (ITS 2025/302) and the register of information (ITS 2024/2956)
  • Three routes: full framework, microenterprise, Art. 16(1) simplified framework
  • Instant download · Secured by Stripe · needs Excel 2019 / Microsoft 365 or LibreOffice

📄 Look inside first: free sample (PDF) — the full file list plus the first pages of a real document from the pack (G1 welcome guide, D22 incident classification tool, D29 ICT third-party policy). We email it to you.

Licence scope: single-entity licence: covers one legal entity. Each additional legal entity, including other companies in the same group, needs its own licence.

30-Day Update-or-Add Pledge: if a template doesn’t fit your environment, email info@nis-2-templates.com within 30 days and we’ll update it or add it. You keep everything either way.

Digital download — by accessing the files you waive the 14-day right of withdrawal in accordance with EU Directive 2011/83/EU, Art. 16(m). You’ll be asked to consent at checkout.

SKU: NIS2-DORA-EN Category:

Description

DORA documentation for small and mid-sized financial entities, built from the official texts. 42 editable files take you from applicability through incident reporting, resilience testing and the register of information — with 1,173 requirements of DORA and its RTS and ITS mapped to a document, and the 16 places where the law is open flagged instead of guessed.

✓ 42 files — 35 Word + 7 Excel
✓ DORA + 8 RTS/ITS, cited to the paragraph
✓ Instant download · fully editable
✓ Secured by Stripe
✓ Published by ZILIO

DORA is live. Its detail sits in nine legal acts.

The Digital Operational Resilience Act, Regulation (EU) 2022/2554, has applied since 17 January 2025. The Regulation sets the obligations; eight technical standards fill in the detail. The classification thresholds for a major incident are in one delegated regulation, the reporting time limits in another, the report forms in an implementing regulation, the register-of-information templates in a fourth, and the simplified framework for smaller entities in a fifth.

Documentation built from summaries of those texts leaves you checking every line yourself. This pack does the opposite: each document tells you which provision a statement rests on, quotes the legal text where the wording matters, and says plainly where the text gives no answer.

Built from the official texts — and honest where they are open

Every article, paragraph, point, threshold, time limit and template field cited in the pack comes from the published text of these nine acts:

Act What it governs Where you use it in the pack
Regulation (EU) 2022/2554 (DORA) ICT risk management, incidents, testing, ICT third-party risk (Chapters II–V) All documents
Delegated Regulation (EU) 2024/1774 ICT risk-management framework (Title II) and simplified framework (Title III) D02–D20
Delegated Regulation (EU) 2024/1772 Incident classification criteria and materiality thresholds D22 classification tool
Delegated Regulation (EU) 2025/301 Content and time limits of major-incident reports D23 reporting procedure
Implementing Regulation (EU) 2025/302 Standard forms for incident reports and cyber-threat notifications D24 drafting workbook
Implementing Regulation (EU) 2024/2956 Register-of-information templates D31 register workbook
Delegated Regulation (EU) 2024/1773 Policy on ICT services supporting critical or important functions D29, D30, D32
Delegated Regulation (EU) 2025/532 Subcontracting of ICT services supporting critical or important functions D32, D33
Delegated Regulation (EU) 2025/1190 Threat-led penetration testing (TLPT) D28 TLPT readiness guide

The documents keep law and advice apart, and label the difference. Words in quotation marks are copied exactly from the legal text. A pack choice is a frequency, deadline or threshold the pack proposes so the document works in practice — the law does not set it, and you may change it. A pack reading marks a provision that can reasonably be read more than one way.

16 interpretation points, out in the open. DORA and its standards leave some questions unanswered. The Welcome guide lists all 16 in one table — the question, the pack’s default, and the document where it applies — so your management body decides them knowingly instead of discovering them in a supervisory review. Two examples:

  • Does the resilience testing of Article 24 apply to Article 16(1) entities, when Article 16(1) disapplies only Articles 5 to 15? The pack applies it, sets out both readings and leaves the decision to the management body.
  • Under RTS (EU) 2024/1772, does the “two or more Member States” threshold for geographical spread count your home Member State? The text does not say. The classification tool computes the result under each reading and shows DEPENDS ON INTERPRETATION when they differ.

Where a pack default is the more demanding reading, it was chosen so that a later view from your competent authority does not leave you with a gap.

What’s inside — 36 templates + 6 guides (42 files)

Guides — start here (G1–G6)

Welcome guide with the 16 interpretation points; implementation guide with three routes; applicability and proportionality assessment covering all 20 financial-entity types of Article 2(1); role matrix; readiness checklist with a Week-1 minimum and a 90-day plan; the requirements master map (Excel).

ICT risk management — Chapter II (D01–D20)

Management body responsibilities and approval record, ICT risk-management framework, resilience strategy, risk methodology with Excel risk register, asset management with Excel asset register, and the policies and procedures DORA and RTS (EU) 2024/1774 call for: encryption, operations, patching, network security, logging, change, physical security, access control, continuity, backup, learning from incidents, crisis communication and the framework review report. D20 is the one-document simplified framework for Article 16(1) entities.

Incidents — Chapter III (D21–D25)

Incident management policy; Excel classification tool built on the seven criteria of RTS (EU) 2024/1772; major-incident reporting procedure with the RTS (EU) 2025/301 time limits; Excel report-drafting workbook following the ITS (EU) 2025/302 forms field by field; Excel incident and cyber-threat log with a reporting clock.

Resilience testing — Chapter IV (D26–D28)

Testing programme with a single test calendar, test plan and report template with findings register, and a TLPT readiness guide for entities identified for threat-led penetration testing under RTS (EU) 2025/1190.

ICT third-party risk — Chapter V (D29–D34)

Policy on ICT services supporting critical or important functions, pre-contract risk assessment and due diligence, the register of information (Excel, every ITS (EU) 2024/2956 template), Article 30 contractual provisions checklist and model clause bank, subcontracting assessment, exit strategy and exit plan.

Every policy and procedure works the same way

Purpose and legal framework with quotations, scope, definitions, RACI, numbered requirements, a proportionate-application section for microenterprises and Article 16(1) entities, exceptions register, KPIs and review triggers, the provisions relied on, and an implementation checklist.

See all 42 files
Doc Title Format Main legal basis
G1 Welcome and How to Use This Pack Word Pack overview
G2 DORA Implementation Guide Word Three routes, phased
G3 DORA Requirements Master Map Excel All nine acts
G4 Applicability and Proportionality Assessment Word Arts 2, 3(60), 4, 16
G5 DORA Role Matrix Word Arts 5, 6(4)
G6 Readiness Checklist and 90-Day Plan Word Chapters II–V
D01 Management Body ICT Responsibilities and Approval Record Word Art. 5
D02 ICT Risk Management Framework Word Art. 6; RTS 2024/1774 Arts 1–3
D03 Digital Operational Resilience Strategy Word Art. 6(8)
D04 ICT Risk Assessment Methodology Word Arts 6, 8; RTS 2024/1774 Art. 3
D04R ICT Risk Register Excel Arts 6(8)(b), 8
D05 Information Security Policy Word Art. 9(4)(a); RTS 2024/1774 Arts 2, 29
D06 ICT Asset Management Policy and Procedure Word Art. 8; RTS 2024/1774 Arts 4–5
D06R ICT Asset Register Excel Art. 8
D07 Encryption and Cryptographic Key Management Policy Word RTS 2024/1774 Arts 6–7
D08 ICT Operations, Capacity and Performance Policy Word Art. 7; RTS 2024/1774 Arts 8–9
D09 Vulnerability and Patch Management Procedure Word RTS 2024/1774 Art. 10
D10 Data, System and Network Security Policy Word Art. 9; RTS 2024/1774 Arts 11, 13, 14
D11 Logging and Anomalous Activity Detection Procedure Word Art. 10; RTS 2024/1774 Arts 12, 23
D12 ICT Project, Acquisition, Development and Change Management Word RTS 2024/1774 Arts 15–17
D13 Physical and Environmental Security Policy Word RTS 2024/1774 Art. 18
D14 Human Resources, Identity Management and Access Control Policy Word RTS 2024/1774 Arts 19–21
D15 ICT Business Continuity Policy and Response and Recovery Plans Word Art. 11; RTS 2024/1774 Arts 24–26
D16 Backup, Restoration and Recovery Procedure Word Art. 12
D17 Learning and Evolving: Post-Incident Review and Training Record Word Art. 13
D18 Crisis Communication Plan Word Art. 14
D19 Report on the Review of the ICT Risk Management Framework Word Art. 6(5); RTS 2024/1774 Art. 27
D20 Simplified ICT Risk Management Framework Word Art. 16; RTS 2024/1774 Arts 28–41
D21 ICT-Related Incident Management Policy and Process Word Art. 17
D22 Incident Classification Tool Excel Art. 18; RTS 2024/1772
D23 Major ICT-Related Incident Reporting Procedure Word Art. 19; RTS 2025/301
D24 Incident Report Drafting Workbook Excel Arts 19–20; ITS 2025/302
D25 Incident and Cyber Threat Log Excel Arts 17–19
D26 Digital Operational Resilience Testing Programme Word Arts 24–25
D27 Test Plan, Test Report and Findings Register Word Arts 24–25
D28 TLPT Readiness Guide Word Arts 26–27; RTS 2025/1190
D29 Policy on ICT Services Supporting Critical or Important Functions Word Art. 28(2); RTS 2024/1773
D30 Pre-Contract Risk Assessment and Due Diligence Checklist Word Art. 28(4)
D31 Register of Information Workbook Excel Art. 28(3); ITS 2024/2956
D32 Key Contractual Provisions Checklist and Clause Bank Word Art. 30
D33 Subcontracting Assessment Checklist Word RTS 2025/532
D34 Exit Strategy and Exit Plan Word Art. 28(8)

Seven working spreadsheets, not tables pasted into Word

  • Incident Classification Tool (D22). One sheet per criterion of RTS (EU) 2024/1772 — clients and transactions, reputational impact, duration and downtime, geographical spread, data losses, critical services, economic impact — leading to a major / not major determination, plus recurring incidents and significant cyber threats. Seven interpretation settings are approved once; the alternative readings are always computed and shown.
  • Incident Report Drafting Workbook (D24). Every field of the ITS (EU) 2025/302 annexes: 76 fields of the major-incident template (initial, intermediate and final report) and 20 fields of the cyber-threat notification, with a submission check before anything is sent.
  • Incident and Cyber Threat Log (D25). One register for every ICT-related incident and cyber threat, with timeline, submissions and reporting clock, impact costs and losses, and a dashboard of checks.
  • Register of Information Workbook (D31). All 15 templates of ITS (EU) 2024/2956, B_01.01 to B_99.01, with the ITS column codes and names, a field dictionary and a completeness check that flags missing mandatory fields.
  • Requirements Master Map (G3). 1,173 requirements from the nine acts, each with a verbatim excerpt, whether it applies to a full-framework entity, a microenterprise or an Article 16(1) entity, and the pack document and section that addresses it. Set your profile and TLPT status, and every row is marked as applying to you or not, with a coverage dashboard on top.
  • ICT Risk Register (D04R) and ICT Asset Register (D06R). Functions, assets, information assets, dependencies and third parties in one place, with risk treatment, accepted risks and dashboards.

Dropdown lists guide the inputs in all seven workbooks; formula cells are shaded grey and the sheets are not protected, so you can add columns and adapt formulas freely. No macros.

One pack, three routes — decided before you write a word

DORA is not one-size-fits-all, and the pack does not pretend it is. The Applicability and Proportionality Assessment (G4) records your Article 2(1) category, any exclusion, microenterprise status (Art. 3(60)), Article 16(1) status and TLPT identification. The answer sets your route:

Route Who What you use
Full framework Financial entities that are neither microenterprises nor Article 16(1) entities D01–D19 and D21–D34 (D28 only if identified for TLPT)
Microenterprise Financial entities meeting DORA Art. 3(60) The same documents, with the relief the law grants listed in G4 — D28 not required
Article 16(1) entity Small and non-interconnected investment firms, exempted payment and e-money institutions, small IORPs and the other entities listed in Art. 16(1) D20 (simplified framework, RTS (EU) 2024/1774 Title III) with D05 in place of most Chapter II documents, plus the Chapter III–V documents that still apply

Almost every template has a proportionate-application section, so a payment institution, an e-money institution, an investment firm, a crypto-asset service provider or an insurance intermediary adapts one set of documents instead of hunting for the parts that apply. A small entity does not need 42 separately approved documents: the framework document explains how to merge components, as long as each still has exactly one home.

ICT providers answering client DORA demands. The pack is written from the financial entity’s side, and that is what a provider needs to see. G4 has an ICT third-party service provider path, and the clause bank (D32) has a section on using it as a provider: map your standard terms against every Article 30 element, prepare a DORA addendum, and get ready the subcontracting information your customers must record in their register (D31, template B_05.02).

Start where the deadlines are

Incident reporting has external time limits, and RTS (EU) 2025/301 sets them: the initial notification within four hours of classifying an incident as major and no later than 24 hours after becoming aware of it, the intermediate report within 72 hours of the initial notification, the final report one month after the latest intermediate report. The readiness checklist (G6) opens with a Week-1 minimum — be able to classify an incident and, if it is major, notify on time — then a 90-day plan. The implementation guide (G2) sets the order and the dependencies between documents for each route, so you approve the applicability assessment first and adapt each template once.

What the pack does not do

  • It is not legal advice and does not guarantee compliance. You adapt every document to your authorisation, systems and providers, decide the interpretation points, and your management body approves the result.
  • It states no penalty amounts. DORA leaves penalties to the Member States (Art. 50(3)).
  • It does not quote ESA joint guidelines, Q&As or national supervisory guidance. Each document has a place to record the guidance your competent authority expects you to follow.
  • The workbooks are where you prepare the register and the reports. Submit them in the format and through the channel your competent authority specifies.
  • The model contract clauses are drafting, not law: have them reviewed against the law governing each contract before use.

The pack vs. the alternatives

  Start from blank DORA Compliance Pack — €449 Consultant-led
Legal basis of each statement You trace it yourself Cited at article, paragraph or point level; quotations copied exactly Varies
Open questions in the law Found as you go 16 listed, each with a default and where to decide it Varies
Incident classification Build your own calculator Excel tool on the RTS (EU) 2024/1772 criteria Varies
Register of information Build from the ITS annexes All 15 ITS templates with completeness check Varies
Smaller-entity relief Read the carve-outs yourself Three routes and a proportionate-application section in almost every template Varies
Cost Your team’s time €449 one-time Day rates

Honest note: a template pack replaces the drafting, not the implementing. You still run the controls, keep the records and make the decisions. The pack is built so that those records have a defined home and every document points to the provision behind it.

Software

Documents are Word files (.docx) for Microsoft Word or LibreOffice Writer. The spreadsheets need Microsoft Excel 2019 / Microsoft 365 or LibreOffice Calc. Excel 2016 and older lack the MINIFS/MAXIFS functions some dashboard cells use and show #NAME? there.

See the quality before you buy

Three free sample PDFs from the pack:

€449 — one-time payment, single legal entity licence, instant download.

This is a digital download, so the right of withdrawal is waived at checkout in accordance with EU Directive 2011/83/EU, Article 16(m) — you’ll be asked to consent to this before payment. To help you anyway, there’s a 30-day update-or-add pledge: if a template doesn’t fit your environment, email us within 30 days and we’ll update it — or add a document outside the standard scope. You keep everything either way.

Frequently asked questions

Does this pack make us DORA compliant?

No template can, and be wary of any that claims to. Compliance depends on what your entity actually does. The pack gives you the documents DORA and its technical standards call for, each tied to the provisions behind it; you adapt them to your authorisation, systems and providers, decide the open interpretation points, and your management body approves the result.

Which legal texts does it follow?

Regulation (EU) 2022/2554 (DORA) and eight technical standards: Delegated Regulations (EU) 2024/1774, 2024/1772, 2025/301, 2024/1773, 2025/532 and 2025/1190, and Implementing Regulations (EU) 2025/302 and 2024/2956. Citations go to article, paragraph or point level, and text in quotation marks is copied exactly. ESA guidelines, Q&As and national guidance are not quoted. Before relying on a provision, check EUR-Lex for amendments made after the date of your pack version.

What are the 16 interpretation points?

Questions the legal texts leave open — for example whether Article 24 testing applies to Article 16(1) entities, how the geographical-spread threshold counts Member States, or whether a separate cloud tenancy counts as physically segregated for restoration under Article 12(3). The Welcome guide lists all 16 with the pack’s default and the document concerned. Your management body decides them, on legal advice where needed, and records the decision.

We are a microenterprise or an Article 16(1) entity. Is this for us?

Yes. The applicability assessment (G4) establishes your status, and the implementation guide (G2) has a separate route for each case. Article 16(1) entities use the simplified framework (D20) under RTS (EU) 2024/1774 Title III in place of most Chapter II documents. Microenterprises keep most documents with the relief the law grants, and do not need the TLPT readiness guide.

We are an ICT provider, not a financial entity. Is it useful?

If your customers are financial entities, they must put the DORA Article 30 contract elements into their contracts with you and record your services in their register of information. The pack shows you exactly what they will ask for: G4 has an ICT provider path, and the clause bank (D32) has a section on using it as a provider to map your terms and prepare a DORA addendum. The rest of the pack is written for the financial entity itself.

What software do I need?

Microsoft Word or LibreOffice Writer for the 35 documents. For the 7 spreadsheets, Microsoft Excel 2019 / Microsoft 365 or LibreOffice Calc; Excel 2016 and older show #NAME? in some dashboard cells. No macros.

Does it cover NIS2 or national rules?

The pack implements DORA. The applicability assessment records whether you have also been identified under national NIS2 rules, because DORA Article 1(2) treats DORA as the sector-specific act for those entities; national law and penalties are outside its scope (DORA leaves penalties to the Member States, Art. 50(3)). For NIS2 itself, see our NIS2 Complete Toolkit.

Can we submit the register or incident reports straight from the workbooks?

The workbooks follow the ITS templates and forms field by field and check completeness, but they are where you prepare the content. The ITS do not set a file format for the register; submit in the format and through the channel your competent authority specifies.