Glowing glass ledger rows with one amber row looping back into line, representing an ISO 27001 nonconformity being corrected and closed

ISO 27001 Nonconformity and Corrective Action: How Auditors Grade Major vs Minor, and the 12 Fields Every Closure Record Needs

In short

  • An ISO 27001 nonconformity needs correction and corrective action; ISO/IEC 17021-1 clause 9.4.9 makes the certification body require a cause analysis “within a defined time”.
  • A major must be verified before certification; a minor needs an accepted plan.
  • DNV allows up to 90 days; TÜV NORD six weeks to report.
  • Checked against: European Accreditation FAQs, DNV and TÜV NORD rules, CIR 2024/2690.

It is tempting to mark a finding “closed” on the day the fix goes live. Certification bodies look for more. DNV’s client rules ask for evidence that corrections and corrective actions were “effectively implemented”, and a consultancy guide to clause 10.2 goes further: a finding in a quarterly process should stay open until the next quarterly run has worked. That gap between “fixed” and “proven fixed” is what this guide is about.

This guide covers what clause 10.2 of ISO/IEC 27001:2022 asks you to do, how auditors decide between major and minor, the closure windows four rule sets impose, the root-cause methods that hold up, and the 12 fields a closure record needs. A later section shows how the same register serves an organisation that is also under NIS2.

Does this apply to you?

Plain-language summary: clause 10.2 applies to every ISO 27001 ISMS, whoever finds the problem. Who sets the deadline depends on where the finding came from.

Free Download

Get the NIS2 Article 21 Compliance Checklist

90+ assessment items mapped to CIR 2024/2690 — instant PDF, no payment.

✓ Check your inbox — the PDF is on its way.

Your situation What governs the finding Who sets the closure deadline
Certification or surveillance audit by an accredited body Clause 10.2 for your response; ISO/IEC 17021-1 for the body’s decision The certification body, “within a defined time” (clause 9.4.9)
Internal audit, incident, monitoring result or management review Clause 10.2 and your own nonconformity procedure You, in your procedure
Cloud, data centre, managed (security) service, DNS, trust service and other providers listed in Article 1 of CIR 2024/2690 Clause 10.2 plus CIR Annex point 2.3.3, which binds you directly You, but results must reach the management bodies
Other NIS2 essential or important entities Clause 10.2 plus Article 21(2)(f) as transposed in your Member State You, within your national law

If you are still preparing for certification, the order of audits and the go/no-go gates are covered in our guide to the ISO 27001 Stage 1 and Stage 2 audit. This article starts where that one stops: the finding is written, and now it has to be closed.

What clause 10.2 requires, step by step

Plain-language summary: fix the problem, find out why it happened, check whether it exists elsewhere, remove the cause, prove the fix worked, and keep the evidence.

In the 2022 edition the clause changed number, not purpose. ISO’s redline preview of ISO/IEC 27001:2022 shows the two parts of clause 10 swapped: 10.1 is now continual improvement and 10.2 is nonconformity and corrective action. Registers and procedures that still cite “10.1” for nonconformities are quoting the 2013 numbering.

The clause runs as a fixed sequence. High Table’s clause guide lists it as: take action to control and correct the nonconformity, deal with the consequences, review it, determine its causes, determine whether similar nonconformities exist or could occur, implement any action needed, review the effectiveness of any corrective action taken, and make changes to the ISMS if necessary, keeping documents and evidence for audit.

Two of those steps are where registers fall short.

  • The extent check. “Determine whether similar nonconformities exist or could occur” turns a single finding into a search. If an auditor finds one system missing from the access review, the question is how many other systems are missing, not only how to add that one.
  • The decision not to act. The clause asks you to evaluate the need for action, so “no corrective action” can be a valid outcome. URM Consulting’s guide to clause 10.2 says that where you decide not to act, you should document the reasoning and management approval, raise the risk in the risk register and link it from the nonconformity register.

Correction is not corrective action

The certification side keeps the two apart. Clause 9.4.9 of ISO/IEC 17021-1, quoted in European Accreditation’s FAQ 48.17, says: “The certification body shall require the client to analyse the cause and describe the specific correction and corrective actions taken, or planned to be taken, to eliminate detected nonconformities, within a defined time.”

Correction Corrective action
Targets The instance you found The cause, so it does not recur
Example Remove the unauthorised account Tie joiner-mover-leaver tickets to the access review so leavers cannot be missed
Timing Immediately After root-cause analysis, on an agreed date
How a body checks it Evidence the instance is gone Evidence the cause is gone, often at the next audit

Schellman, which describes itself as an ISO certification body, sets separate clocks for the two: evidence of correction is due within 30 days, while remediation should “address the aforementioned root cause”. A response that lists only the correction answers half the question.

How certification bodies grade a finding: major, minor and the grey zone

Plain-language summary: a finding is first a nonconformity or not. Then the auditor asks whether it affects the ISMS’s ability to achieve its intended results. Yes means major, no means minor.

The definitions come from ISO/IEC 17021-1:2015 and are quoted in European Accreditation’s FAQ on the definition of nonconformity: a nonconformity is “non-fulfilment of a requirement”, and a major is one that affects “the capability of the management system to achieve the intended results”. Our Stage 1 and Stage 2 audit guide covers what each grade does to an initial certificate. In practice, auditors grade from patterns like these:

Finding pattern Usual grade Basis
A required process is absent (no corrective action process, no risk assessment, no management reviews) Major URM examples; DNV “absence of one or more required system elements”
A group of minors against the same element Major ISO/IEC 17021-1, Note 1 to its definition of a major: a number of minors on the same requirement “could demonstrate a systemic failure”; DNV: a group of category 2 nonconformities indicating inadequate implementation
A minor that was not corrected as agreed Major DNV: persistent category 2 “shall be up-graded to category 1”
One lapse in an otherwise working process (one department on an outdated policy version, one system’s access-review evidence missing) Minor URM examples; DNV “a single system failure or lapse”
A practice that meets the requirement but could be better Opportunity for improvement Not a nonconformity

The second and third rows matter most for planning. Under DNV’s findings rules, a minor left open past its agreed date can come back as a major. Your corrective-action dates are effectively part of the grade.

Can a major be raised against an Annex A control?

Practitioners disagree. URM’s guide says majors “can be raised against management system clauses only” and “should not be raised against individual Annex A controls since the controls are not mandatory”, although repeated minors against related controls may still point to a systemic clause failure.

The definition itself is wider. “Non-fulfilment of a requirement” does not limit itself to clauses 4 to 10, and URM’s own guide counts your ISMS policies and procedures as a source of requirements. A control you selected in your Statement of Applicability and then never ran can therefore be read as a failed requirement of your own system. Neither reading is settled in the sources we checked. Ask your certification body which one its auditors apply before you argue a grade.

Arguing a grade works only on substance. European Accreditation’s FAQ 39.1 states that “the names of the findings or nonconformities are not important, but at least the meanings or definitions of the nonconformities shall be the same”, and that nonconformities “shall not be recorded as opportunities for improvement”. Argue on the capability test, not the label.

Closure windows: what ISO/IEC 17021-1 fixes and what each certification body adds

Plain-language summary: the accreditation standard sets few hard numbers. Your certification body’s contract sets the dates you actually have to meet.

90 days is DNV’s standard maximum deadline for corrections and corrective actions on any nonconformity, “regardless of the category of non-conformity and type of audit”.

Source: DNV, eAdvantage user guidance: Findings

Rule set Response or plan Major Minor
ISO/IEC 17021-1 (via European Accreditation FAQs) Cause analysis, correction and corrective action “within a defined time” (9.4.9) Initial certification: if not verified within 6 months of the last Stage 2 day, another Stage 2 No fixed number in the FAQs we checked; the client’s plan must be reviewed and accepted before the decision (9.5.2 c)
DNV Max. 90 days for all nonconformities Evidence of root cause and effective actions within the 90 days; follow-up normally on site Full evidence within the 90 days preferred; at minimum an acceptable plan, with implementation verified at the next audit at the latest
Schellman Nonconformity report with plan and root cause within 14 days Correction within 30 days, remediation within 60 days Correction within 30 days, remediation by the subsequent review
TÜV NORD CERT Within 6 weeks of the last audit day, depending on the seriousness of the nonconformity: the corrective actions with dates, or confirmation they are implemented If the 6 weeks are missed, the audit is not passed and a certificate is not issued or is withdrawn

Recertification compresses everything. DNV wants its team leader’s recommendation no later than 10 working days before the certificate expires and sets nonconformity deadlines to fit. TÜV NORD allows a tolerance period of at most 6 months for evaluating corrective actions after a recertification audit. European Accreditation’s FAQ 36.14 lets a lapsed certificate be restored within 6 months if the outstanding recertification activities are completed; otherwise at least a Stage 2 is needed.

The practical rule: plan to the shortest clock in your contract, not the longest one you have heard of. A team used to DNV’s 90 days that moves to a body with a 14-day plan deadline risks missing its first response.

Root cause analysis that survives the auditor’s “why?”

Plain-language summary: keep asking why until fixing the answer would stop the problem coming back. “Human error” is almost never that answer.

The question is not optional for external findings. TÜV NORD’s procedure says “an analysis of the causes must be performed for each nonconformity”, and DNV asks for a root cause analysis “to identify corrective actions to prevent recurrence”. For findings you raise yourself, clause 10.2 asks you to evaluate the need for action, so a short analysis can be proportionate for a trivial lapse.

The Five Whys method is the usual starting point, and the CMS Five Whys tool, written for US healthcare quality teams, adds a stop test that works in an ISMS too: “If the most recent response were corrected, is it likely the problem would recur?” If yes, you have a contributing factor, not a root cause. The tool notes “it often takes three to five whys, but it can take more than five”, and offers the fishbone diagram as another technique when Five Whys alone does not reach the root cause.

An illustration on a typical minor, one leaver’s account still active:

  1. Why was the account active? The leaver was not removed at the quarterly access review.
  2. Why not? The review list was exported from the directory, and this application keeps its own local accounts.
  3. Why is it not in the export? Nobody recorded which applications sit outside the directory.
  4. Stop test: if the list of non-directory applications existed and fed the review, would this recur? Probably not. That is the root cause.

The extent check follows directly: every other application with local accounts carries the same risk. URM’s guide lists causes of this kind (no clear ownership, no reminder or tracking process, poor training, outdated procedures) and rejects “human error” or “someone forgot” as root causes, because they do not explain why the system allowed the issue to occur.

The 12 fields every closure record needs

Plain-language summary: each field answers a question an auditor will ask. If a field is empty, the auditor asks the question out loud.

The list below combines URM’s register fields with the steps of clause 10.2 and the evidence certification bodies ask for.

# Field Why it is there
1 ID and source (certification audit, internal audit, incident, monitoring, management review) Lets you show every source feeds one process
2 Requirement not fulfilled: clause, selected control or your own policy, with its reference A nonconformity is “non-fulfilment of a requirement”; name which one
3 Description and objective evidence Records what was actually found, not the auditor’s summary
4 Date raised Starts the clock your certification body applies
5 Grade (major, minor, or your internal severity) Decides the deadline and how the body follows up
6 Correction taken, consequences dealt with, and date Clause 10.2’s first step; Schellman wants evidence of correction within 30 days
7 Root cause, with the method used TÜV NORD and DNV both require a cause analysis
8 Extent check: where else could this exist, and what you checked Clause 10.2 asks whether similar nonconformities exist or could occur
9 Corrective action, owner, target date, and approved date changes URM recommends a documented approval route for extending target dates
10 Links to the incident, change request and risk register entry Shows operational changes went through change management, and a “no action” decision through risk acceptance
11 Effectiveness review: method, date, reviewer, result For a periodic process, URM advises closing only after the next successful run
12 ISMS documents changed, closure date and closure approval Clause 10.2’s last step: change the ISMS if necessary, through document control

Field 2 is where your own documents matter. If the requirement breached is a rule in your information security policy, cite the policy section, not just “A.5”. Field 11 is the one the European Accreditation example shows going wrong: a minor on management review inputs closed once a template had been changed, with the certificate issued and “effective implementation to be verified at the first surveillance”. Changed paperwork is a correction; a review that has actually run on the new template is the effectiveness evidence. Our management review template guide covers the review inputs.

One register for the ISO audit and the NIS2 audit trail

Plain-language summary: NIS2 adds two things to an ISO register: a second legitimate way to close a finding, and a duty to report results to the management body.

Article 21(2)(f) of Directive (EU) 2022/2555 requires “policies and procedures to assess the effectiveness of cybersecurity risk-management measures”. For the providers listed in Article 1 of Implementing Regulation (EU) 2024/2690, Annex point 2.3.3 sets the closure rule: “The results of the independent reviews, including the results from the compliance monitoring pursuant to point 2.2 and the monitoring and measurement pursuant to point 7, shall be reported to the management bodies. Corrective actions shall be taken or residual risk accepted according to the relevant entities’ risk acceptance criteria.”

Set that beside the 12 fields and three adjustments follow.

  • Add the accept path. Field 10 already links a “no action” decision to the risk register. Under point 2.3.3, that decision is taken according to your risk acceptance criteria, and the register should name the criterion used.
  • Tag the source the CIR way. Point 2.3.3 names three result streams: independent reviews (point 2.3), compliance monitoring (point 2.2) and monitoring and measurement (point 7). Adding these as values in field 1 lets one filter produce the management-body report.
  • Report the results upward. Point 2.3.3 makes reporting results to the management bodies a binding duty for the relevant entities. If your ISO management review already covers nonconformity results, one summary can serve both.

Point 7.2 also asks you to decide what is monitored and measured, by which methods, when, and who analyses the results. An effectiveness review in field 11 that names its method and reviewer is evidence for that point as well. For how findings from penetration tests, backup tests and post-incident reviews route under the Annex, see our guide to corrective action under NIS2.

Who owns which step

Role Owns Effort
ISMS manager or CISO Grading response, root cause, extent check, effectiveness review (fields 5 to 8, 11) High
Control or process owner Correction and corrective action delivery (fields 6, 9) Medium
Compliance officer Certification-body deadlines, change and document control links, closure approval (fields 4, 10, 12) Medium
Top management or the management body Risk acceptance decisions and the results report Low
SME owner without an ISMS team All of the above, so start with fields 2, 6, 7 and 11: they decide the grade and the closure Medium

For SMEs, the cheapest win is the field 11 discipline. Booking the effectiveness check in the calendar when the action is agreed guards against the DNV rule above: a minor not corrected as agreed is upgraded to a major.

Frequently asked questions

Does every nonconformity need a root cause analysis?

Every finding raised by your certification body does: clause 9.4.9 of ISO/IEC 17021-1 makes the body require a cause analysis, and bodies such as TÜV NORD apply it to each nonconformity. For findings you raise internally, clause 10.2 asks you to evaluate the need for action, so the depth can match the risk. Record the decision either way.

Can a minor nonconformity become a major?

Yes, in two ways. Under the note to ISO/IEC 17021-1’s definition of a major, a number of minors on the same requirement could demonstrate a systemic failure and together constitute a major. Separately, DNV upgrades a single minor that is persistent or not corrected as agreed to a major.

How long do I have to close a finding?

As long as your certification body’s rules allow. The four sets compared above range from a 14-day plan deadline (Schellman) and 6 weeks to report (TÜV NORD) to a 90-day standard maximum (DNV, which accepts a plan for minors). Check the deadline in your contract before the closing meeting, not after.

Next step

Take your three oldest open findings and check them against fields 6, 8 and 11. If any has a correction but no root cause, no extent check or no effectiveness evidence, it is not closed in the sense your auditor will apply, whatever the status column says. Start with those before the next surveillance visit. The wider certification path, from scope to surveillance, is in our ISO 27001 compliance guide, and the audit that generates most internal findings is covered in the ISO 27001 internal audit checklist.

This article provides general information only and does not constitute legal or regulatory advice. Requirements may vary by jurisdiction and organisation type. Consult a qualified legal professional or compliance specialist for advice specific to your situation.

Sources

  1. ISO/IEC. ISO/IEC 27001:2022 redline preview, contents list (clauses 9 and 10). iTeh Standards
  2. Neil Jones. ISO 27001 Clause 10.2: Nonconformity and corrective action, 17 June 2026. URM Consulting
  3. ISO 27001:2022 Clause 10.2 Nonconformity and Corrective Action Explained. High Table
  4. European Accreditation. FAQ Question 35.10: Definition of nonconformity. EA
  5. European Accreditation. FAQ Question 36.14: Corrections and corrective actions. EA
  6. European Accreditation. FAQ Question 39.1: Findings classification – Nonconformities. EA
  7. European Accreditation. FAQ Question 48.17: ISO/IEC 17065 – Closing NCs before certification decision (quotes ISO/IEC 17021-1 clause 9.4.9). EA
  8. DNV. eAdvantage user guidance: Findings. DNV
  9. Schellman. What to do after an ISO-related nonconformity, updated 19 March 2026. Schellman
  10. TÜV NORD CERT. Description of the Certification Procedure MS – ISO 27001, ISO 22301, ISO 20000-1, sections 1.4, 3 and 7. TÜV NORD
  11. Centers for Medicare & Medicaid Services. Five Whys Tool for Root Cause Analysis (QAPI). CMS
  12. European Commission. Commission Implementing Regulation (EU) 2024/2690, Article 1 and Annex points 2.2, 2.3 and 7. Official Journal of the European Union (Publications Office)
  13. European Parliament and Council. Directive (EU) 2022/2555 (NIS2), Article 21(2)(f). Official Journal of the European Union (Publications Office)